炉子安装(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
炉子安装(国外英文资料)

炉子安装(国外英文资料) Further confirmation of the location of the installation; Open the box, remove the heating furnace, confirm the temperament is consistent, if not the agreement should be changed or do the record; Remove stents and drawings; Install flue: Connect the bottom five pipes, and be careful to add the gaskets and tighten them. Turn on the power and indoor temperature controller. Turn on the front panel of the machine, connect the power supply according to N, L, and E, according to the temperature controller to connect 1-3 contact, install the panel. 7. Water injection and leak detection: open the tap water inlet switch, switch on water injection, water injection to heating system, until 3 bar, close the switch, water injection to see whether there are funnelled, and pay attention to whether the relief valve pressure relief; Open the hot water tap at the same time to see if there are any leaks; Try the soap water to try to see if there is a gas leak in the gas line. Turn off the tap water, turn on the waterflood switch, turn on the faucet, and put a portion of the heating system in the water until the water pressure drops to about 1Bar. Fill in the installation record. This completes the installation process. This section describes the debugging process 1. To the system with water, open the exhaust valve on the radiator and water pump on the automatic exhaust valve, until the water pressure 1 bar, check to see if all piping connections has funnelled; Turn on the faucet to see if all the piping connections have a leak. Plug in the power socket and turn on the gas switch. Open the front panel; The first ignition, To turn the pattern into summer, turn on the faucet and observe the electronic fire and ignition. Adjust the water flow, adjust the temperature control of the hot water, and observe whether the flame has changed and changed. When the temperature is high, the flame is large and the flame becomes smaller. Turn the pattern to winter and watch the electronic

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档