16秋北交《建筑施工(专)》在线作业1(国外英文资料)

16秋北交《建筑施工(专)》在线作业1(国外英文资料) North construction (special) online homework 1 A RadioButtonList (a total of 10 questions, a total of 30 points.) 1. precast reinforced concrete piles horizontal stack poured to make lower concrete design strength can be cast (upper). A. 25% B. 30% C. 40% D. 50% The correct answer: 2. is the construction process of the hanging frost white veneer (features). The construction method of A. paste B. wet operation method of installation C. dry operation method of installation D. can be more than three The correct answer: 3. in pretensioned system, the concrete strength i