16秋北交《建筑施工(专)》在线作业1(国外英文资料).doc

16秋北交《建筑施工(专)》在线作业1(国外英文资料).doc

  1. 1、本文档共29页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
16秋北交《建筑施工(专)》在线作业1(国外英文资料)

16秋北交《建筑施工(专)》在线作业1(国外英文资料) North construction (special) online homework 1 A RadioButtonList (a total of 10 questions, a total of 30 points.) 1. precast reinforced concrete piles horizontal stack poured to make lower concrete design strength can be cast (upper). A. 25% B. 30% C. 40% D. 50% The correct answer: 2. is the construction process of the hanging frost white veneer (features). The construction method of A. paste B. wet operation method of installation C. dry operation method of installation D. can be more than three The correct answer: 3. in pretensioned system, the concrete strength is generally not less than the ratio of the number of standard strength of concrete, prestress (can). A. 50% B. 60-70% C. 75% D. 100% The correct answer: 4. quality inspection of High Pressure Jet Grouting grouting in the end (after). A. for 1 weeks B. for 2 weeks C. for 3 weeks D. for 4 weeks The correct answer: Connecting 5. reinforced concrete prefabricated pile reinforcement should be used (). A. first poured in the wall B. pre cast wall C. first corner casting D. thin wall casting The correct answer: 6. the construction height is the meaning of (). A. site elevation B. natural ground C. design elevation minus the natural elevation D. Center site elevation minus the natural elevation The correct answer: 7. pit (trench) earthwork embankment can be calculated using the following method (). A. triangular prism method B. uniform calculation method The calculation method of C. quasi column volume D. tetragonal prism method The correct answer: 8. post tensioned construction with 0 to 105 Sigma ##on holding for 2 minutes to a ##on stretching program, super tension in order to reduce the prestress loss caused by (). A. anchor B. hole friction C. relaxation of steel Shrinkage of D. concrete The correct answer: 9. high temperature, pouring concrete slipform construction (should). A. first poured in the wall B. pre cast wall C. first corner casting D. thin wall casting The correct answ

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档