16秋北交《建筑施工(专)》在线作业1(国外英文资料)
16秋北交《建筑施工(专)》在线作业1(国外英文资料)
North construction (special) online homework 1
A RadioButtonList (a total of 10 questions, a total of 30 points.)
1. precast reinforced concrete piles horizontal stack poured to make lower concrete design strength can be cast (upper).
A. 25%
B. 30%
C. 40%
D. 50%
The correct answer:
2. is the construction process of the hanging frost white veneer (features).
The construction method of A. paste
B. wet operation method of installation
C. dry operation method of installation
D. can be more than three
The correct answer:
3. in pretensioned system, the concrete strength is generally not less than the ratio of the number of standard strength of concrete, prestress (can).
A. 50%
B. 60-70%
C. 75%
D. 100%
The correct answer:
4. quality inspection of High Pressure Jet Grouting grouting in the end (after).
A. for 1 weeks
B. for 2 weeks
C. for 3 weeks
D. for 4 weeks
The correct answer:
Connecting 5. reinforced concrete prefabricated pile reinforcement should be used ().
A. first poured in the wall
B. pre cast wall
C. first corner casting
D. thin wall casting
The correct answer:
6. the construction height is the meaning of ().
A. site elevation
B. natural ground
C. design elevation minus the natural elevation
D. Center site elevation minus the natural elevation
The correct answer:
7. pit (trench) earthwork embankment can be calculated using the following method ().
A. triangular prism method
B. uniform calculation method
The calculation method of C. quasi column volume
D. tetragonal prism method
The correct answer:
8. post tensioned construction with 0 to 105 Sigma ##on holding for 2 minutes to a ##on stretching program, super tension in order to reduce the prestress loss caused by ().
A. anchor
B. hole friction
C. relaxation of steel
Shrinkage of D. concrete
The correct answer:
9. high temperature, pouring concrete slipform construction (should).
A. first poured in the wall
B. pre cast wall
C. first corner casting
D. thin wall casting
The correct answ
您可能关注的文档
- (宋明清建筑风格特征与代表构造).JPG(国外英文资料).doc
- (八年级数学)图形的全等(二)—全等三角形的识 …(国外英文资料).doc
- (平面设计人必备的封套尺寸)(国外英文资料).doc
- (人教)高中英语第二册下12单元测试题(国外英文资料).doc
- (电大毕业论文范文)对10例气管切开患者的临床医学论文发表(国外英文资料).doc
- (中秋节快乐)离散大家上机第2题(国外英文资料).doc
- (建筑工程)第1章3(国外英文资料).doc
- (第一卷)(国外英文资料).doc
- .Net Memory Profiler(国外英文资料).doc
- 00301.中学化学实验现象总结(国外英文资料).doc
- 2024高考物理一轮复习规范演练7共点力的平衡含解析新人教版.doc
- 高中语文第5课苏轼词两首学案3新人教版必修4.doc
- 2024_2025学年高中英语课时分层作业9Unit3LifeinthefutureSectionⅢⅣ含解析新人教版必修5.doc
- 2024_2025学年新教材高中英语模块素养检测含解析译林版必修第一册.doc
- 2024_2025学年新教材高中英语单元综合检测5含解析外研版选择性必修第一册.doc
- 2024高考政治一轮复习第1单元生活与消费第三课多彩的消费练习含解析新人教版必修1.doc
- 2024_2025学年新教材高中英语WELCOMEUNITSectionⅡReadingandThi.doc
- 2024_2025学年高中历史专题九当今世界政治格局的多极化趋势测评含解析人民版必修1.docx
- 2024高考生物一轮复习第9单元生物与环境第29讲生态系统的结构和功能教案.docx
- 2024_2025学年新教材高中英语UNIT5LANGUAGESAROUNDTHEWORLDSect.doc
文档评论(0)