2012市政增值服务1(国外英文资料)
2012市政增值服务1(国外英文资料)
The national level construction qualification examination counseling (2012 Edition)
Municipal utilities review
2012 Internet value-added services (1)
Comprehensive test (a)
A single choice. (a total of 20 questions, 1 points for each question. Each item options, only one of the most to do)
1, in the formal compaction of subgrade, it is necessary to do the test section, in order to obtain the roadbed or base construction related technical parameters. This parameter does not belong to the following construction parameters is ().
A, B, pre sedimentation value of subgrade compaction, soil D, C is suitable for compaction mode
2, about the nature of base material, the following statement is correct: (a).
The plate of A, lime, cement and soil were good, can be used for high grade pavement base
B, lime and cement soil: water stability and frost resistance is poor, strong crack resistance
C, two ash stabilized soil strength, plate body, water stability and frost resistance of lime soil is strong, can be used for high grade pavement base
D, two ash stabilized gravel and small shrinkage, high strength plate body is strong, can be used for high grade pavement base
3, when the high embankment construction site of underground water in the wet state, need to take measures for subgrade drainage, which belongs to the method is in the following: (a).
A, B, deep mixing cement pile of Geotextile
C, D, plastic drainage plate surcharge preloading
4, the mechanical method of straightening steel, must be strictly controlled to ensure the tension rate, reinforced performance, among them, HPB235, HRB400 respectively (cold drawing).
A, 1%, 2%, 2% B, 1% C, 1% D, 3%, 2%, 3%
5, the prestressed tension is the key process of bridge construction, the following statement is correct: (a).
A, using the stress control method, control tension must comply with the requirements of design and specification
B, with more than 6% elongation measured value theoretical elongation, must stop