The fourth chapter: overhead lines and cable lines
1. the power line can be divided into ().
C. overhead power lines and power cable lines 2., from the local substation to the user substation or between urban and rural power transformers, are used to distribute electrical energy, referred to as.
D. distribution line
3. the line whose voltage is above 220kV is called ().
C. high voltage transmission line
4. the power line is the main component of the electric power network, its function is () the electric energy.
B. transport and distribution
5. high voltage power lines can generally be divided into ().
A. transmission lines and distribution lines
6., the line between the power plant, the step-up substation and the substation, and between the substations, is used to transport electrical energy, known as.
B. transmission line
7. power lines are the main channels and tools for electrical energy.
A. transport and distribution
8. the main components of overhead power lines are: towers and their foundations, wires, insulators, cables, transverse arms, fittings, etc..
D. lightning protection equipment and grounding device
9. reinforced concrete poles belong to ().
B. cement rod C
10. straight poles and towers are represented by symbols.
A.Z
11. tension towers are represented by symbols.
B.N
12. of overhead lines (lines) used to limit the line to break or reverse the impact of the accident.
B. tension tower
13. in the overhead line, the first base tower at the end of the line, the terminal of the power plant or substation, and the end of the base tower belong to ().
D. terminal tower
14., under normal circumstances, generally do not bear the tension in the direction of the line, as long as the vertical load and horizontal load of the tower as ().
A. straight pole tower
15. the overhead line is located at the corner of the line, in addition to the vertical load and wind pressure of the conductor, the tower with the resultant force of the rotation of the conduct
您可能关注的文档
- 初中物理复习提纲(V1.0暂只提供初二版)(国外英文资料).doc
- 初中物理复习提纲(V10暂只提供初二版)(国外英文资料).doc
- 初中数学课程标准(国外英文资料).doc
- 初中社会复习总纲(国外英文资料).doc
- 初中科学化学反应沉淀 颜色(国外英文资料).doc
- 初中部分数学公式(国外英文资料).doc
- 初中英语教学中存在问题及解决途径(国外英文资料).doc
- 初二下物理试题(国外英文资料).doc
- 初二数学上册知识点(国外英文资料).doc
- 初二数学上册知识点总结 3页(国外英文资料).doc
- 4.13+香港和澳门回归祖国+课件++2024-2025学年统编版八年级历史下册.pptx
- 6.17+君主立宪制的英国++课件+2024-2025学年统编版九年级历史上册.pptx
- 2025年中考语文复习名著导读专题《钢铁是怎样炼成的》课件.pptx
- 第11课《记承天寺夜游》课件+视频2024-2025学年统编版语文八年级上册.pptx
- 5.14+艺复兴运动++课件++2024-2025学年统编版九年级历史上册.pptx
- 20 联合国与世界贸易组织 2024-2025学年统编版九年级历史下册.pptx
- 15 第二次世界大战 2024-2025学年统编版九年级历史下册.pptx
- 小流域综合治理经济评价报告书样本.doc
- 美丽绍兴完整版.pptx
- 公司金桥项目投标书样本.doc
文档评论(0)