建筑施工考试复习题及参考参案(国外英文资料).docVIP

建筑施工考试复习题及参考参案(国外英文资料).doc

  1. 1、本文档共20页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑施工考试复习题及参考参案(国外英文资料)

建筑施工考试复习题及参考参案(国外英文资料) Construction examination review questions and reference case.Txt This article is contributed by myeducs DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. Central South University modern distance education curriculum examination review question, Central South University modern distance education curriculum examination review question and reference answer Building construction 1. Fill in the blanks 1. The water collecting pipe has a diameter of 100 to 127mm. Each section is 4m, and the distance between the pipe and the well point is m. 2. The single row layout of light well points is applicable to the width of foundation pit less than m. Back。 3, light well point water discharge law is first big and small, first 4, deep foundation pit supporting structure according to force mode is divided into and. 5 、 deep mixing cement soil pile construction machine has deep mixer and deep mixer. 6, reinforced concrete precast pile concrete strength to the design strength of the square can transport and pile driving. 7, there are two methods and methods. When pile diameter is used, the sequence of pile driving has little influence on soil extrusion. 8, the pile spacing is greater than 9, the slurry wall into holes, the role of the protective pile in the pile is to protect the orifice and. 10, the two main functions of slurry in the bored pile are wall protection and. _ problem. 11, it is easy to break the pile and m when the cast-in-place pile is immersed in the tube. 12, high pressure jet grouting adopts three tube method, the effective diameter is 13, and deep mixing method adopts reflected wave method to check the quality, and its maintenance is not less than days.. 14, the higher level can be reinforced, T-shaped welded joints is 15, steel bars and plates should be chosen. 16, steel mechanical connections can only be used for ribbed reinforcement is.. 17,

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档