搅拌桩、静压桩(国外英文资料).doc

  1. 1、本文档共25页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
搅拌桩、静压桩(国外英文资料)

搅拌桩、静压桩(国外英文资料) Measures for the quality control of cement mixing pile construction As is known to all, during the construction of soft clay foundation, the cement mixing pile construction is one of the common processing method, its main features are: a reasonable time limit, low pressure during the construction of the operation, safe and reliable, less pollution, no vibration, no noise, and buildings with no adverse effects on the surrounding environment. How to increase the capacity of soft soil foundation and reduce the compressive quantity of soft soil foundation is the key to controlling the construction quality of cement mixing pile. Quality control of preparation before construction Construction preparation and ground level The convenient way to enter the construction machinery shall be repaired; 1.1.2 power supply facilities shall be complete. Diesel generators shall be provided in the construction site without external power source. 1.1.3 find out the obstacles in the construction area. There are large stones and underground pipes, etc. All obstacles should be cleared or established in advance to avoid and ensure safe production; 1.1.4 level is flat. In the area where the pile is being prepared, the bulldozer will be made first with the bulldozer, then the coarse sand cushion will be refilled, then the ground plane will be flat. Where conditions are available, the roller can be pressed for 1 ~ 2 times. Construction lofting First using total station (or transit) accurately release starting pile construction paragraph and line position, and design requirements of steel pile spacing with sticks to identify the pile location within the scope of construction (general according to the regular triangle arrangement). Quality control of raw material The quality of 1.3.1 cement (curing agent) is the key, and the variety and quality of cement used should meet the design and specification requirements. Before the cement approach, it is necessary to sample the stability

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档