- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
海进江试题(国外英文资料)
海进江试题(国外英文资料)
1. the requirements for berthing of large ships and super large ships in the provisions of the ship alignment system of the Yangtze River in Jiangsu?
Answer: large vessels and super large vessels must be moored at anchorage or anchorage areas issued by the competent authorities. When a large ship or an ultra large vessel, in case of inclement weather or main engine fault, needs to be released as soon as possible, the navigation lane, the recommended route or the particular route should be given as much as possible.
2. Yingongzhou narrow one-way traffic control object and the control leg controlled and so the principle?
Answer: controlled objects: 3000 tons and above ships; 3000 DWT and above fleet.
Controlled segment: 105-1 red river waters between Chau and Yangtze River floating 105-1 black floating connection line between the Yin and the Yangtze River under the tower lighthouse No. 104 floating red line; waters between the Yangtze River and the Yangtze River floating black No. 100 No. 100 red line floating to the Yangtze River No. 101 and No. 101 black floating floating red line.
The principle of waiting for a ship, such as a ship, a ship, or a ship to be pulled into, so that it is pulling out of the ship.
3. channel Funan one-way traffic control object and the control leg, let the controlled principle?
Answer: controlled objects: 3000 tons and above ships, towing volume of 3000 tons and above the fleet. Controlled segment: 1) the Yangtze River No. 45 traffic and 45 floating floating red line to the Yangtze River and 47 black floating Deji waters between the beacon line;
2) Yangtze River 48 black floating to the Yangtze River 52 black floating and chemical pier line between waters;
3) the waters between the Yangtze River and the Yangtze River No. 56 black buoy No. 56 red floating line to the Yangtze River and the river floating black No. 58 Hong Kong line.
The principle of waiting for a ship, such as a ship going upstream, a vessel to be pulled in, a
您可能关注的文档
最近下载
- 人教版历史九年级上册全套教学课件.pptx
- DL_T 1074-2019 电力用直流和交流一体化不间断电源(代替DL_T 1074-2007).docx VIP
- 2025秋统编版(2024)道德与法治一年级上册教学设计(全册) .pdf
- 白癜风中西医防治(王砚宁)_部分1.pdf VIP
- 第二单元生物制品生产等基本技术61课件.pptx VIP
- 最全监理大纲(共486页).docx
- DLT_5293-2013 电气装置安装工程 电气设备交接试验报告统一格式.docx VIP
- MZT213-2024学术类社会团体自身建设指南.pdf VIP
- 职业素养与职业礼仪.docx VIP
- 政务视联网系统解决方案.pptx VIP
文档评论(0)