高层施工(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
高层施工(国外英文资料)

高层施工(国外英文资料) The total land area of the project is 7456.91m2, and the total construction area is 20378.19m2. A building 11 floors on the ground (including the top layer), B Building 1 floor underground and 15 floors on the ground (including the top layer), are the main cast frame shear wall structure, the foundation of pile foundation; laying underground 1 floors, 3 floors on the ground, the main cast-in-situ frame structure, foundation pile base. The B building and the mall is usually negative a layer of underground garage, the wartime air defense projects, the height is 4.7m; A building B building and podium a ~ three layers of shopping malls, high starting from + 0 respectively: 5.7m, 4.8m, 4.8m; A, B, building four layer and four layer above residential standard, high-level 3.0m and A building eaves height 42m, total building height of 45m, B building eaves height 51m, total building height of 54m. Shopping mall eaves 15.250m, building height 18.250m. The following is the development project on $= /, real estate limited commercial building project, located in the city at all - ^ 21# Avenue, from the main building (A, B two), foundation and basement. The total land area of the project is 7456.91m2, and the total construction area is 20378.19m2. A building 11 floors on the ground (including the top layer), B Building 1 floor underground and 15 floors on the ground (including the top layer), are the main cast frame shear wall structure, the foundation of pile foundation; laying underground 1 floors, 3 floors on the ground, the main cast-in-situ frame structure, foundation pile base. The B building and the mall is usually negative a layer of underground garage, the wartime air defense projects, the height is 4.7m; A building B building and podium a ~ three layers of shopping malls, high starting from + 0 respectively: 5.7m, 4.8m, 4.8m; A, B, building four layer and four layer above residential standard, high-level 3.0m and A building eaves height 42m, total building

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档