- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
一建笔记(国外英语资料)
一建笔记(国外英文资料)
2014.7.2
In order to purge media
1, nominal diameter greater than or equal to 600 liquid gas cleaning.
2, the nominal diameter of less than 600 liquid water cleaning
3, the nominal diameter of less than 600 air cleaning. 06:48
In 4, the steam pipe steam cleaning.
5, non thermal pipeline shall not use steam cleaning.
Blow wash general provisions
Qualified 1, pipeline pressure test, the construction unit of the organization, purge purge scheme.
2, check the pipe support and hanger firmly, not allowed to purge the isolation equipment.
3, the valve in the pipeline pressure test is not involved in the purge, purge purge valve before protected, not before the installation hole plate and flange connection valve, throttle valve, safety valve, main valve, valves, instrumentation, welding instruments should be removed through the bypass valve head and valve seat fire protection set.
4, the order of supervisor, branch pipe, pipe transportation.
Pipeline pressure test
1\
1, pipeline pressure test should be in heat treatment, nondestructive testing, hydraulic or pneumatic hydraulic test, can not can not do the occasional Design Institute to pressure. Do pressure test of brittle materials.
Hydraulic test
1, clean water as the medium, the chloride ion in water is less than 25ppm
2, temperature is not lower than 5 degrees higher than the corresponding transition temperature of metal materials, prohibited materials testing temperature close to brittle transition temperature.
1.5 times 3, steel or non-ferrous metal pipeline design pressure, not less than 0.4Mp.
4, the test pressure for 10 minutes down to 30 minutes, the design of pressure regulator with no leakage, no pressure.
5, without pressure.
Air pressure test
1, air or inert gas, non-toxic, non flammable, dry gas.
Air pressure test for 1.15 times the design pressure.
2, before the experiment, must use the air and test, the test pressure 0,2Mp
3, test pressure rose to 50%, check whether there is leakage abnormal, a
您可能关注的文档
最近下载
- 2025年安徽皖江高速公路有限公司高速公路收费人员招聘笔试模拟试题及答案解析.docx VIP
- T GXTC 0014—2024 新式(现制)茶饮 茉莉花茶基底茶.pdf VIP
- 急性视网膜坏死综合征.pptx VIP
- 正常人体解剖学资料.pdf
- 《相遇问题》(说课稿)-2024-2025学年四年级上册数学青岛版[001].docx VIP
- 外伤性感染性眼内炎防治专家共识(2023年版)PPT.pptx VIP
- 第1节 功(教学课件)物理沪粤版2024九年级上册.pptx VIP
- 违规接受吃请检讨书(推荐).docx VIP
- 2024新人教版一年级数学上册认识立体图形第三单元教材整体分析.pdf VIP
- 密码技术应用员理论知识题及答案.doc VIP
文档评论(0)