实务11—15(国外英语资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
实务11—15(国外英语资料)

实务11—15(国外英文资料) 2A312000 construction technology 2A312010 construction survey 2A312011 familiar with the contents and methods of construction survey Knowledge point 1: main work and method of construction survey Main work of construction survey 1. measuring the known length 2. measurement of known angles 3. layout of detail location of building 4. building details, elevation, location and inclination of the building Construction surveying method 1. distance measurement: according to the accuracy requirements can be divided into the general distance and precision distance two methods. 2. angle measurement: use theodolite to complete 3. the layout of the detail points of the building can be achieved by the Cartesian coordinate method, polar coordinate method, angle intersection method and Distance Intersection Method Surveying 4. building height: complete level or by direct measurement ruler 09 examination questions When the construction site of the construction control network for the grid or axis form, the use of (A) building details of the plane location of the most convenient measurement. A. rectangular coordinate method B. polar coordinate method C. angle intersection method D. Distance Intersection Method Typical questions: A point elevation is 36.05m, take A point as the back view point, B point as the front view point, leveling survey, front view point reading is 1.12M, rear view point reading is 1.22m, then the elevation of B points is () M. A. 35.15 B. 35.95 C. 36.15 D 36.95. Answer: C Train of thought: B point elevation, =A point elevation + back view reading - forward view reading =36.05+1.22-1.12=36.15. Knowledge point two: function and application of construction survey instrument 1. components: theodolite alidade, horizontal disc, base part three 2. functions: the main function is to measure horizontal angle between two directions; secondly, it can also measure the vertical angle; the level ruler, using distance measurement principle, it can also measur

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档