- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电伴热施工(国外英语资料)
电伴热施工(国外英文资料)
Documents from the network, I collected, finishing, and if there are omissions, errors, but also please correct me!
Electric tracing construction
(a) design drawing
There should be a complete design plan before construction
The following information shall be included in the drawing:
1, the line number, the power supply points with rectangular lattice
2 、 the type and length of electricity required by the line
(unit: m)
3, the length of the length of the pipeline per meter, the length of the tropical (unit: meter), that is, winding factor
4, each valve required electricity, tropical length
(unit: m)
5. List of accessory materials for heating system
6, temperature control system parts list
7. Material list for construction
8. Design parameters and specifications of thermal insulation materials adopted
(two) preparation before construction;
(A) piping systems
1 、 the piping system and equipment have been completed
2, rust proof anti-corrosion coating has dried
3 、 piping system construction specification is consistent with the design drawings
4. File all burrs and corners
(B) electrical heating and fittings
1 、 whether the surface of the electricity tropics is damaged or not
2, electric tropical good insulation properties (requirements of insulation resistance in 1000VDC test with the shaking table of no less than 20M Ohm)
3 、 the type of the electric hot strip and all the fittings are in accordance with the design requirements
(C) site preparation
1 place a coil of hot wire and reel on a bracket and place it near one end of the line
2, along the pipe cloth distribution tropical, and avoid:
* place the hot air on the burr and corner
* pull the electrically heated tropics vigorously
A foot or weight placed in the electric tropics
(three) single electric hot zone construction method
1 glass fiber pressure sensitive tapes or aluminium tapes are fixed to the pipe at about 50Cm every day
2, flat as far as possible to the tropical electricity attached to the lo
您可能关注的文档
最近下载
- 某县关于巩固拓展脱贫攻坚成果同乡村振兴有效衔接工作的表态发言.docx VIP
- 体格检查【呼吸内科】--PPT课件.ppt VIP
- 3.2 营造清朗空间 课件 统编版道德与法治 八年级上册.pptx VIP
- 活动课 家国情怀与统一多民族的演进 课件-高一上学期统编版(2019)必修中外历史纲要上.pptx VIP
- 2024高考英语天津卷历年作文范文衡水体临摹字帖(描红无参考线).pdf VIP
- 水工建筑物止水带技术规范DLT52152023年.docx
- Tableau数据可视化基础.pptx VIP
- 2025年职业技能邮件快件安检员参考题库含答案解析(5套试卷).docx VIP
- 地面数字电视接收技术考核试卷.docx VIP
- 呼吸科病史采集.pptx VIP
文档评论(0)