桥梁人工挖孔专项方案介绍.doc

云南公投建设集团有限公司 上鹤高速公路土建一合同段五工区 桥梁桩基础人工挖孔作业 专项施工方案 2015年08月25日 目 录 第一章:工程概况 一、工程简介········································1 地质、水纹情况··································3-13 三、主要危险源辨识··································13 第二章:编制目的及依据 一、编制目的········································14 二、编制依据········································14-15 第三章:施工计划 一、总进度计划······································15 二、具体任务分工、拟投入的机械设备及人员情况········15-16 三、计划投入应急设备、器材待材料物资················16 第四章:施工工艺 一、施工准备········································17-18 二、施工工艺及方法··································18 (一)工艺流程图····················