Division 15 - Mechanical Section 15880 - Air Distribution 1 Part 1: General 1 01 Summary The work in this section consists of furnishing, installing mechanical, electrical and control connections, starting up of air distribution system mentioned in Part 2 “Products” and providing all tools, labours, equipment and materials to perform the work. 1 01 01 Section Includes 01.0 Air cleaning devices 02.0 Duct work 03.0 Sound attenuators 04.0 Air terminal units 05.0 Air outlets and inlets 1 01 02 Products Delivered But Not Installed Under This Section 1 01 03 Products Installed But Not Deli