道路施工方案英文版

ROAD CONSTRUCTION MANUAL A. CONSTRUCTION SURVEY PROCEDURES A.1 General. The center line of the traveled portion of the road shall be located in the center of the right-of-way, and shall be located in the field by an authorized (licensed) land surveyor. A.2 Stations. Stations shall be established along the road center line every fifteen (15) meters and at all radius points (P.C.s and P.T.s). The beginning of this line shall be designated as Station 10+0 and shall start at the existing street right-of-way line. A construction stake shall be placed at each center line station. This stake will