- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2011年二级建造师考试《机电工程》练习题(国外英文资料)
2011年二级建造师考试《机电工程》练习题(国外英文资料)
In 2011, the secondary builders test electromechanical engineering
Scene: the electrical equipment installation project of A power plant on June 6, 2008. The equipment includes a device and secondary equipment, mainly energy conversion equipment, switching equipment and lightning protection equipment. Project to be finished at June 30, 2008, after the commissioning, equipment are not safe quality problem, but in July 30, 2008, a switch blowout accident happened in the plant, after investigation, the reason is that the circuit breaker to cut off the electric current through a circuit, the switch between the contact arc, arc have not been put out in a timely manner, the combustion time is too long, causes high inner pressure switch and burst accidents.
According to the scene, answer the following questions:
The following are equipment ().
dynamo
transformer
Circuit breaker
transformer
Electric relay
Answer: the ABCD
According to function and structure, switch equipment can be divided into ().
Circuit breaker
relays
C. Fuse
Load switch
Disconnecting switch
Answer: ACDE
The main measures to extinguish the arc include ().
A. adopt an insulating medium to blow arcs, elongate the arc, increase the cooling surface and increase the heat transfer rate
Improve the speed of break between the contacts
C. place the contact in a vacuum
D. to reduce the arc temperature by cooling the insulating medium, reducing the thermal emission and thermal dissociation to extinguish the arc
E. Reduces the pressure of the insulating medium, reducing the density of the gas and causing the arc to go out
Answer: the ABCD
The following belong to the lightning protection equipment ().
A.
Lightning conductor
C. arrester
D.
Circuit breaker
Answer: ABC
Scene: an electromechanical company contracts the mechanical transmission system installation of a pharmaceutical company. Equipment includes: chain drive, shaft, key, coupling and clutch. After installation, the mechanical
您可能关注的文档
- 05直流电动机电力拖动(国外英文资料).doc
- 01m 01n 自动变速箱(国外英文资料).doc
- 0-模拟电子技术基础课绪论(国外英文资料).doc
- 025速度改变快慢的描述 加速度(国外英文资料).doc
- 01电脑英语词汇表(国外英文资料).doc
- 02.5.速度改变快慢的描述 加速度(国外英文资料).doc
- 04--增强盘感(国外英文资料).doc
- 06款新秀数据流(国外英文资料).doc
- 07级高三物理实验复习意见和建议(一)(国外英文资料).doc
- 07.汽车制造工艺流程(国外英文资料).doc
- 2011年度驾驶员资格考试大纲(大型养路机械)(国外英文资料).doc
- 2011年广东省中考物理试题电子版(国外英文资料).doc
- 2011年度工作总结(国外英文资料).doc
- 2011年经济师《中级经济基础》全真模拟试卷(国外英文资料).doc
- 2011年《中药化学》历年真题精选考前强化(国外英文资料).doc
- 2012,如果你是农民要靠什么赚钱呢?外出打工、开小卖部、在家养...(国外英文资料).doc
- 2011年海淀中考一模《物理》试题及答案(国外英文资料).doc
- 2012年助理物流师考试冲刺试题及答案4 - 副本(国外英文资料).doc
- 2012复习题(国外英文资料).doc
- 2012年俄罗斯国际照明展会(国外英文资料).doc
文档评论(0)