- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
长江电力全解(国外英文资料)
长江电力全解(国外英文资料)
The Yangtze electric power is fully unsolved by the introduction of 2010-01-19 21:55
After a year, Yangtze power to complete the overall listing: to undertake the debt, to the three gorges corporation non-public equity and pay cash, buy the target assets held by the three gorges corporation, including (1) of the three gorges power station 18 Taiwan mono-device 700000 kw generators and related power generation facilities; (2) six subsidiary production specialists.
Yangtze power of consideration paid a total of 107.5 billion yuan, including: (1) to undertake with the debts of the target assets of about 50 billion yuan, including three gorges debt, borrowing and foreign exchange currency borrowing; (2) to issue a total of 15.52 billion shares to the company, and issue price 12.89 yuan/shares, totaling about 20 billion yuan; (3) it will pay about 375 billion yuan to the company.
Listed so far in 2003, Yangtze power, respectively, in 2003, 2005, 2007 to the major shareholders of the three gorges project corporation bought the three gorges of 8 units of 700000 mw unit, the single price of 45.9, 49.2, and 5.22 billion yuan respectively. The acquisition of the single price is about 5.97 billion yuan (considering the acquisition includes six professional company and the three gorges power plant auxiliary production related to power generation facilities, the actual unit price should be less than 5.94 billion RMB), compared with the previous three times although have significantly improved, but still within acceptable range.
In the early days of the trading suspension of the Yangtze electric power (600900) in 2008, the market had expected the restructuring to inject the assets of the Yangtze electric power, including the remaining 18 units of the three gorges corporation. Six underground units and two hydropower projects under construction in jinsha river. The final restructuring included only 18 units, in the context of a change in capital markets. (according
您可能关注的文档
最近下载
- 化学与能源 化学与常规能源.ppt.ppt VIP
- 4-2023学年度第二学期上海市各区语文二模题目分类-说明文阅读-答案.docx VIP
- 材料销售挂靠协议书.docx VIP
- DBJ_T03-113-2019:岩土工程勘察规范.pdf VIP
- 人教版(2024)新教材八年级物理下册第十二章:简单机械每节课(分层作业)汇编(含四套题).doc VIP
- 韩国电影幻灯片.ppt VIP
- 02s404防水套管图集.docx VIP
- 一例糖尿病性视网膜病变患者的个案护理课件.pptx VIP
- 2007维拉克斯 3.8 维修手册.pdf VIP
- [山东]社区服务中心深基坑施工组织设计(土钉墙)15984.doc VIP
文档评论(0)