- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
WBS编码(国外英语资料)
WBS编码(国外英语资料)
WBS decomposition structure of schedule management
A signed project management contract
B project management department is coming in
C engineering drawing design
C/01 scheme design
C/02 preliminary design
C/03 preliminary design approval
C/04 construction drawing design
C/04.01 construction drawing design
C/04.02 construction drawing audit
C/04.03 deliver drawings
D for project planning procedures
D/01 application for planning and design review notice
D/02 special approval (air defense, fire fighting, traffic, garden)
D/03 commencement plan transferred to formal plan
D/04 apply for construction project planning permit
E works permit
E/01 receive approval form
E/02 municipal matching signed
E/03 tender to receive application form
E/04 bidding for approval procedures
E/05 construction general contract contract operation
Preparation and approval of E/05.01 prequalification documents, bidding documents
E/05.02 tender preparation meeting
E/05.03 bidding documents
E/05.04 reconnaissance site
Preparation and submission of E/05.05 bidding documents
E/05.06 bid opening
E/05.07 organize the bidding unit to reply and prepare the bid evaluation report
E/05.08 calibration notice
E/05.09 agrees to sign and sign the general contract
E/05.10 general contract filing
E/06 supervision contract operation
E/06.01 tender qualification review
E/06.02 bidding documents
E/06.03 reconnaissance site
Preparation and submission of E/06.04 bidding documents
E/06.05 issuing
E/06.06 organizing the bidding unit to reply and prepare the bid evaluation report;
E/06.07 calibration notice
E/06.08 supervision contract signing
E/06.09 supervision contract filing
E/07 execution supervision contract
Review of E/07.01 project supervision outline
Supervision performance evaluation of E/07.02 project implementation process
E/07.02.01 project schedule control
Quality control of E/07.02.02 project
E/07.02.03 project cost control
E/07.02.04 engineering change, expense claim and price adjustment man
您可能关注的文档
- Java作业二(国外英语资料).doc
- java初级考试代码(国外英语资料).doc
- java参数定义(国外英语资料).doc
- Java同步、异步相关知识点(国外英语资料).doc
- Java基础知识点(国外英语资料).doc
- JAVA多线程并发(国外英语资料).doc
- Java 学习最佳途径--工具篇(国外英语资料).doc
- Java应用程序窗口关闭的六种方法(国外英语资料).doc
- JavaScript全局预定义变量和函数解释(国外英语资料).doc
- Java应用程序项目的打包与发行(国外英语资料).doc
- weather(国外英语资料).doc
- wchar_t,wchar_t,wchat_t数组,char,char,char数组(国外英语资料).doc
- WebService的利弊(国外英语资料).doc
- web基础以及web与应用程序的区别(国外英语资料).doc
- Web服务器和应用程序服务器有什么区别(国外英语资料).doc
- web测试标准中英文文档(国外英语资料).doc
- WFC应用程序软件包(国外英语资料).doc
- win XP任意自动更新法(国外英语资料).doc
- win7 随意移动文件夹设置(国外英语资料).doc
- win7、xp双系统中win7启动菜单的修复方法(原创,绝对有效)(国外英语资料).doc
文档评论(0)