WBS编码(国外英语资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
WBS编码(国外英语资料)

WBS编码(国外英语资料) WBS decomposition structure of schedule management A signed project management contract B project management department is coming in C engineering drawing design C/01 scheme design C/02 preliminary design C/03 preliminary design approval C/04 construction drawing design C/04.01 construction drawing design C/04.02 construction drawing audit C/04.03 deliver drawings D for project planning procedures D/01 application for planning and design review notice D/02 special approval (air defense, fire fighting, traffic, garden) D/03 commencement plan transferred to formal plan D/04 apply for construction project planning permit E works permit E/01 receive approval form E/02 municipal matching signed E/03 tender to receive application form E/04 bidding for approval procedures E/05 construction general contract contract operation Preparation and approval of E/05.01 prequalification documents, bidding documents E/05.02 tender preparation meeting E/05.03 bidding documents E/05.04 reconnaissance site Preparation and submission of E/05.05 bidding documents E/05.06 bid opening E/05.07 organize the bidding unit to reply and prepare the bid evaluation report E/05.08 calibration notice E/05.09 agrees to sign and sign the general contract E/05.10 general contract filing E/06 supervision contract operation E/06.01 tender qualification review E/06.02 bidding documents E/06.03 reconnaissance site Preparation and submission of E/06.04 bidding documents E/06.05 issuing E/06.06 organizing the bidding unit to reply and prepare the bid evaluation report; E/06.07 calibration notice E/06.08 supervision contract signing E/06.09 supervision contract filing E/07 execution supervision contract Review of E/07.01 project supervision outline Supervision performance evaluation of E/07.02 project implementation process E/07.02.01 project schedule control Quality control of E/07.02.02 project E/07.02.03 project cost control E/07.02.04 engineering change, expense claim and price adjustment man

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档