- 1、本文档共25页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
给排水设计基本程序与方法30473(国外英语资料)
给排水设计基本程序与方法30473(国外英语资料)
Water supply and drainage design of.Txt basic procedures and methods without painful wound bleeding, only smiling people sometimes give people the most simple advice is the most difficult. The basic procedures and methods of water supply and drainage design (design writeup)
A working stage
1, design stage:
The feasibility study report of the project proposal???? the preliminary design (preliminary design)???? design?? the construction plan review, review, review of air defense fire.
2, the construction stage
Site drawings???? acceptance.
(water resource network with )
Two, design work flow
Construction drawing according to the following nine steps, according to the situation can also be cross:
1, the meeting convened by the professional, to determine each other provided information time, work plan, architectural design personnel to provide the plane elevation and section. Water professional investment should be divided into 3 stages, the first stage of well location, area, capacity, volume, equipment room area, usually within a week; second stage equipment room layout, fire hydrant, wet alarm valve, water flow indicator position, generally in early time, about 2 ~ 3 week;
The third stage to estimate professional equipment and materials provided in the general table, drawing a week before. Other professional to the professional information provided must be clear about the investment time and write the work plan. The first stage should provide air conditioning air conditioning water supplement, the second phase construction should provide details in the bathroom, time is early, drawing the professional drawn equipment room drawing immediately after entering the bathroom products, investment time must adhere to as soon as possible.
The first construction investment in general is relatively simple, the investment at the first stage, look at a drawing, not the clear place to ask, the design scope should be clear, well distribution area to implem
您可能关注的文档
- 生日打折(国外英语资料).doc
- 生意组合(国外英语资料).doc
- 生日色彩与性格(国外英语资料).doc
- 生活技巧(国外英语资料).doc
- 生物修复技术处理石油钻采废物的实践经验(国外英语资料).doc
- 生财之道(国外英语资料).doc
- 生鲜陈列的基本方式(国外英语资料).doc
- 用优质教育托起明天的太阳-县城区完全小学精神文明活动…(国外英语资料).doc
- 用友ERP-U861薪资管理系统操作常见问题解析(国外英语资料).doc
- 用品牌矩阵解读品牌认知(国外英语资料).doc
- DB32_T 3666-2019家庭服务 母婴护理员(月嫂)服务规范.docx
- DB32 4682-2024预制舱式磷酸铁锂电池储能电站消防技术规范.docx
- DB3212/T 1152-2024公共机构能源资源消费统计管理规范.docx
- DB3213_T 1041-2022 服务业用水定额.docx
- DB3203_T 1043-2023 社区居家医疗护理服务规范.docx
- DB32/T 4661-2024 110kV全户内金属结构变电站雷电防护设计规范.docx
- DB3201_T 1167.2-2023 放心消费示范单位创建规范 第2部分:街区.docx
- DB32/T 4705.2-2024口罩 有毒有害物质的测定 第2部分:禁用偶氮染料.docx
- DB3212_T 2001-2019 鹅林下养殖技术规程.docx
- DB3213T 1023-2021 莴苣-丝瓜-豇豆周年生产技术规程.docx
文档评论(0)