- 1、本文档共19页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
15春西交《电站锅炉原理》在线作业满分答案(国外英语资料)
15春西交《电站锅炉原理》在线作业满分答案
Austrian Peng 15 spring West to the power plant boiler online operation
Total score: 100 test time: -
Radio examination
Judgment question
Radio examination questions (15 questions, 30 points)
1. smoke flow through the convection superheater resistance should be calculated, the value should also be multiplied by 1.2. ()
A. frictional resistance
B. local resistance
C. bundle resistance
Full marks: 2
2. the smoke velocity in the tail flue of the boiler will be raised, and the heating surface at the rear will be intensified. ()
A. ash deposition
B. low temperature corrosion
C. wear
D. ash plugging
Full marks: 2
3., for anthracite combustion, the economic fineness of pulverized coal is required R90. ()
A. is better
B. is a little better
C. is the same as lignite
Full marks: 2
4., the boiling type economizer can not exceed the boiling degree, so as to avoid the excessive flow resistance of the working fluid. ()
A.10%
B.20%
C.30%
D.40%
Full marks: 2
5., can be used for boiling type, but also for non boiling type, mostly coal economizer. ()
A. cast iron
B. steel tube type
C. film type
D. heat pipe type
Full marks: 2
6., improve the working pressure, DC boiler hydrodynamic characteristics. ()
A. stability
B. instability
C. has nothing to do with stress
Full marks: 2
7., the pressure rise, the boiler boiling heat transfer deteriorated starting point. ()
A. ahead of time
B. postponed
C. invariant
Full marks: 2
8. modern large capacity utility boilers often use economizer. ()
A. cast iron
B. steel tube type
C. film type
D. heat pipe type
Full marks: 2
Circulating ratio K of 9. direct current boiler. ()
A. = 0
B. = 1
C. 0
D. 1
Full marks: 2
10. the economizer is often used in the boiler, which not only reduces the metal consumption, but also makes the structure more compact, reduces the height of the tube group and facilitates the arrangement of the heating surface. ()
A. cast iron
B. steel tube type
C. film type
D. heat pipe type
Full marks: 2
11. small a
您可能关注的文档
- (锅盖子)升级破解方法(国外英语资料).doc
- (考试时间:70分钟 试卷满分:70分 考试形式:开卷)(国外英语资料).doc
- (大一必读)写给即将踏入大一的同学,如何度过我的大学(国外英语资料).doc
- (持续添加修正)各地名店名厨多款流行火锅蘸料、味碟配方经典总汇(麻酱、沙茶、海鲜、香辣、肥牛等)(国外英语资料).doc
- (一)申请入本人递交入党申请书(国外英语资料).doc
- (强力推荐)大规模的海水运动(二)洋流对地理环境的影响(国外英语资料).doc
- (设计)工作细则 - 上海工程技术大学 继续教育学院(国外英语资料).doc
- (问答和操作题)(国外英语资料).doc
- 001探究题(黄冈市物理中考题调考题汇编)(国外英语资料).doc
- 01_NEW YORK SENATE RACE SPEECH(国外英语资料).doc
- 2023咸阳职业技术学院招聘笔试真题参考答案详解.docx
- 2023四川化工职业技术学院招聘笔试真题及参考答案详解.docx
- 2023哈尔滨职业技术学院招聘笔试真题及参考答案详解.docx
- 2023商洛职业技术学院招聘笔试真题及答案详解1套.docx
- 2023呼伦贝尔职业技术学院招聘笔试真题参考答案详解.docx
- 2023南阳农业职业学院招聘笔试真题参考答案详解.docx
- 2023天津公安警官职业学院招聘笔试真题带答案详解.docx
- 2023年上海电机学院招聘笔试真题参考答案详解.docx
- 2023年四川艺术职业学院招聘笔试真题参考答案详解.docx
- 2023安徽体育运动职业技术学院招聘笔试真题及答案详解一套.docx
文档评论(0)