2012浙大《建设项目管理》在线作业(国外英语资料)
2012浙大《建设项目管理》在线作业
Zhejiang University construction project management online homework
First, radio questions (24 questions, 48 points) Score: 48
1. () is to provide comprehensive protection for all kinds of construction projects
A. building engineering all risks
B. installation engineering all risks
C. cargo insurance
D. personal accident insurance
The correct answer: A
2. the units responsible for the construction drawings are (
A. supervisor unit
B. design unit
C. audit unit
D. investment unit
The correct answer: B
3., the implementation of project activities (), is the main content of the project plan, but also the basis for other planning work.
A. resource plan
B. schedule
C. capital plan
D. cost plan
The correct answer: B
4. the minimum control period of the project is related to the total duration of the project, usually over one year of the project, and the control period is (...).
A. season
B. month
C. biweekly
D. week
The correct answer: B
5. applies to large complex projects; the company undertakes multiple projects at the same time; when the company has high requirements for artificial utilization, the organization of the project is ().
A. functional organization
B. pure project organization
C. matrix project organization
D. division organization
The correct answer: C
6. risk analysis refers to the application of various (Technology), qualitative, quantitative, or a combination of both methods of dealing with uncertainty
A. risk analysis technology
B. uncertainty Technology
C. probability analysis technique
D. deterministic analysis technique
The correct answer: A
7. construction project management planning is to guide project management work () document.
A. operability
B. programmatic
C. workability
D. implementation
The correct answer: B
8., the core task of construction project management is the project.
A. goal programming
B. target selection
C. target control
D. target demonstration
The correct answer: C
9. the loop in the network diagram is not all
您可能关注的文档
- (锅盖子)升级破解方法(国外英语资料).doc
- (考试时间:70分钟 试卷满分:70分 考试形式:开卷)(国外英语资料).doc
- (大一必读)写给即将踏入大一的同学,如何度过我的大学(国外英语资料).doc
- (持续添加修正)各地名店名厨多款流行火锅蘸料、味碟配方经典总汇(麻酱、沙茶、海鲜、香辣、肥牛等)(国外英语资料).doc
- (一)申请入本人递交入党申请书(国外英语资料).doc
- (强力推荐)大规模的海水运动(二)洋流对地理环境的影响(国外英语资料).doc
- (设计)工作细则 - 上海工程技术大学 继续教育学院(国外英语资料).doc
- (问答和操作题)(国外英语资料).doc
- 001探究题(黄冈市物理中考题调考题汇编)(国外英语资料).doc
- 01_NEW YORK SENATE RACE SPEECH(国外英语资料).doc
文档评论(0)