网站大量收购独家精品文档,联系QQ:2885784924

2012浙大《建设项目管理》在线作业(国外英语资料).doc

2012浙大《建设项目管理》在线作业(国外英语资料).doc

  1. 1、本文档共22页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2012浙大《建设项目管理》在线作业(国外英语资料)

2012浙大《建设项目管理》在线作业 Zhejiang University construction project management online homework First, radio questions (24 questions, 48 points) Score: 48 1. () is to provide comprehensive protection for all kinds of construction projects A. building engineering all risks B. installation engineering all risks C. cargo insurance D. personal accident insurance The correct answer: A 2. the units responsible for the construction drawings are ( A. supervisor unit B. design unit C. audit unit D. investment unit The correct answer: B 3., the implementation of project activities (), is the main content of the project plan, but also the basis for other planning work. A. resource plan B. schedule C. capital plan D. cost plan The correct answer: B 4. the minimum control period of the project is related to the total duration of the project, usually over one year of the project, and the control period is (...). A. season B. month C. biweekly D. week The correct answer: B 5. applies to large complex projects; the company undertakes multiple projects at the same time; when the company has high requirements for artificial utilization, the organization of the project is (). A. functional organization B. pure project organization C. matrix project organization D. division organization The correct answer: C 6. risk analysis refers to the application of various (Technology), qualitative, quantitative, or a combination of both methods of dealing with uncertainty A. risk analysis technology B. uncertainty Technology C. probability analysis technique D. deterministic analysis technique The correct answer: A 7. construction project management planning is to guide project management work () document. A. operability B. programmatic C. workability D. implementation The correct answer: B 8., the core task of construction project management is the project. A. goal programming B. target selection C. target control D. target demonstration The correct answer: C 9. the loop in the network diagram is not all

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档