- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
高速公路长安隧洞身开挖、支护方案大学毕设论文
申嘉湖高速公路湖州鹿山至安吉孝源段
第3合同段
长安隧道
洞身开挖、支护方案
中交第三航务工程局有限公司
项目经理部
二0一六年五月
目 录
一、开挖················································3
1、台阶法开挖·····················································3
2、注意事项·······················································4
3、全断面开挖·····················································9
4、仰拱开挖························································12
5、中心水沟·······················································16
6、超欠挖处理·····················································20
二、超前支护············································20
1、超前小导管······················································20
2、φ25超前全长粘结型锚杆········································22
三、初期支护············································22
1、钢架···························································22
2、钢筋网·························································23
3、钢筋网铺设······················································26
4、锚杆施工·······················································26
5、喷射混凝土施工·················································31
6、超前地质预报···················································34
四、安全、质量措施······································39
1、爆破作业安全措施及应急办法·····································39
2、爆破施工应急措施···············································40
3、爆破安全技术····················································40
4、炮烟及盲炮的预防················································41
5、工程质量检查验收程序···········································42
6、质量保证体系···················································43
7、安全保证体系····················································47
洞身开挖、支护方案
申嘉湖高速公路第3合同段长安隧道所处地层地质复杂,表层断续覆盖第四系残坡积(Qcl+dl)碎石孔隙潜水含水层,厚度小,且多处于地下水常水位以上,降雨时充水,雨后排泄,总体水量贫乏,根据围岩级别和设计要求并结合现场实际地质情况,采用相应的开挖方法:洞口段采用台阶法预留核心土开挖、Ⅳ级、Ⅴ级围岩一般地段采用台阶法开挖、Ⅲ级围岩地段采用全断面法开挖。
一、开挖
1、台阶法开挖
施工原则:
⑴、避免对原地层扰动。
⑵、台阶推进,机械配合人工开挖,必要时采用弱爆破。
⑶、开挖化大为小,支护宁强勿弱。
⑷、轮廓稍大勿小,及早封闭成环。
⑸、稳扎稳打,岩变我变。
洞身开挖采用台阶法预留核心土开挖施工,在隧道开挖过程中,在三个台阶上分七个开挖面,以前后七个不同的位置相互错开同时开挖,然后分部同时支护,形成支护整体,缩短作业循环时间,逐步向纵深推进,形成开挖及初期支护,仰拱紧跟下台阶及时施作构成稳固的初期支护体系。具
您可能关注的文档
最近下载
- (2025年版)基孔肯雅热诊疗方案全文PPT课件.ppt
- 天涯神贴——我当道士那些年(完整版).doc VIP
- 十字相乘法因式分解练习100题及答案.docx VIP
- 中医耳鼻喉外治法课件最新完整版本.pptx VIP
- 《互联网信息服务深度合成管理规定》全文学习PPT课件(带内容).pptx VIP
- 两岸经济协定(ECFA)早收清单内容.docx VIP
- 中职语文应用文专题08调查报告.doc VIP
- API 571-2020影响炼油工业固定设备的损坏机理-中文版.pdf
- ANSI-VITA-46.3-2008.pdf VIP
- 《公路隧道照明设计细则》(D70 2-01-2014 )【可编辑】.docx VIP
文档评论(0)