- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《重庆双碑嘉陵江大桥和双碑隧道规划用地(国外英语资料)
《重庆双碑嘉陵江大桥和双碑隧道规划用地
Chongqing double monument Jialing River Bridge and double monument tunnel planning land
Review opinion of assessment report on overlying mineral resources
The Chongqing Urban Construction Investment Corporation intends to build a double stele Jialing River Bridge and a double monument tunnel, and the evaluation of mineral resources for the planned land use shall be carried out. By the main agent Lin Tongyan (International) commissioned by the International Engineering Consulting Co. Ltd, team of hydrogeology and engineering geology of Chongqing Geological Exploration Bureau of the Nanjiang Shuangbei Jialing River Bridge and tunnel project Shuangbei planning for mineral resource assessment of land areas, and submit the evaluation report preparation. In May 9, 2008, the experts reviewed the report and formed the following opinions:
A, Chongqing Shuangbei Jialing River Bridge and Shuangbei tunnel engineering is a way to connect with the main City West Metro Rapid channel, West in the Western District of Shapingba Yong Zhen unity village, Geleshan Town, the Shuangbei town of Shapingba District, east to Jiangbei Shima River interchange. The line length of 11.57km, the bridge length 1904m, two-way six lane tunnel; 4380m long, double hole two-way six lane tunnel spacing 26m, single hole high 6.5m, width 12m; bridge tunnel connecting line and the rest of the line to six lanes. This project belongs to the type of important construction project, and the protection grade is grade I.
Two. Through field investigation and regional geological data analysis, the report reflects the characteristics of lithology, geological structure and mineral resources of the land to be used. The line to regional folds, faults, line crossing Guanyin gorge anticline and syncline structural features of Shima River, a nearly north-south extension are asymmetric folds. Overall, the geological structure of the evaluation area is simple. Evaluation of formation ofmainly for Jurassic
文档评论(0)