网站大量收购独家精品文档,联系QQ:2885784924

土木工程施工3(国外英语资料).doc

  1. 1、本文档共17页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
土木工程施工3(国外英语资料)

土木工程施工3 Job name: civil engineering construction, 2012 autumn third sets of operations Objective question budget results: 100 points Note: the objective question refers to a single topic, multiple-choice, non title can automatically judge the problem! Detailed information: Question number: 1, question type: Radio question (please choose the only correct answer in the following options): 4 Content: The interval between two adjacent construction processes into the stream construction is called () A, tap time B and water step distance C, process intermittent D, intermittent flow Student answer: B Correctness: correct Question number: 2, question type: Radio question (please choose the only correct answer in the following options): 4 Content: Selecting the daily shift number of each shift is considered when determining the parameters A and number of construction processes B and construction segments C and water step distance D, tap time Student answer: D Correctness: correct Question number: 3, question type: Radio question (please choose the only correct answer in the following options): 4 Content: The essential content of engineering flow construction is () A, division of labor, collaboration B, mass production C, continuous operation D, suitable for lap joint Student answer: C Correctness: correct Question number: 4, question type: Radio question (please choose the only correct answer in the following options): 4 Content: In speeding up the flow of beats, the running distance between any two adjacent professional teams is equal to the time in the flow rhythm A, maximum B, minimum C, GCD D, the minimum divisor Student answer: D Correctness: correct Question number: 5, question type: Radio question (please choose the only correct answer in the following options): 4 Content: The first prerequisite is to organize the rhythmic flow A, make the construction quantity of each construction segment basically equal B determine the flow rhythm of the main construction process C

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档