地下防水工程施工方案与施工工艺(国外英语资料).docVIP

地下防水工程施工方案与施工工艺(国外英语资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
地下防水工程施工方案与施工工艺(国外英语资料)

地下防水工程施工方案与施工工艺 Hangzhou fortune financial center I. brief introduction to engineering Zhejiang fortune financial center from the East and West building two building, West building has 55 floors, 258 meters high; East Building 37 floor, 188 meters high, the total construction area of about 210 thousand square meters, of which the ground floor area of about 170 thousand square meters, underground construction area of about 40 thousand square meters, is a set of a smart office and commercial integrated building, and there is a large underground parking garage. Waterproof project recommended by our company, the use of two layers of 2.0mm thick APF-405 self-adhesive waterproof roll waterproof. The first layer is wet paving, and the second layer is directly attached to the first layer. Two, key and difficult points This project is located in the Qian Tang River, underground water level is high, the basement buried deep (12M), the construction operation space is small, the narrowest construction personnel only sideways through the underground waterproof requirements, (level of water), within a short period of time, the second half of the year (started in December) and seasonal construction, with three and the subway connecting walkway in the basement, the side wall around -8M at nearly 200 supporting beam and the side wall of the connection, connections to be processing factors are put forward higher requirements on the quality of construction. Three 、 construction plan and technical measures Section 1 construction preparation 1. Equipment preparation A) construction tools to clean up the waterproof base: broom, shovel, hammer, chisel steel etc.. B) polymer mortar batching tools: shovels, buckets, mixing drums, etc.. C) construction tools tiles: paper knife, tape, rolling brush, scraper, trowel etc.. 2, artificial preparation A) in order to ensure the quality, waterproof works must be carried out by professional waterproof team; B) waterproof construction, with 6 people

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档