- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大工13春《水利工程概论》在线测试2答案(国外英语资料)
大工13春《水利工程概论》在线测试2答案
Great works, 13 spring, online introduction of hydraulic engineering, 2
Total score: 100 test time: -
Judgment questions (a total of 15 questions, a total of 45 points)
1. the East China Sea Bridge project is equipped with 5000 ton main navigation holes and 1000 ton class and 500 ton auxiliary navigation holes each.
A. error
B. correct
Full marks: 3
2. Dalian Port ore terminal berth due to its small space, can take over two large ore ship at the same time.
A. error
B. correct
Full marks: 3
3.2000 years, Chinas hydropower installed capacity exceeded 300 million kilowatts, ranking first in the world.
A. error
B. correct
Full marks: 3
4., Yangshan deepwater port area can form more than 500 km deep waterfront line, through the capacity of more than 230 million teus.
A. error
B. correct
Full marks: 3
5., the Yangtze River Estuary Deepwater Channel Governance phase three project requires simultaneous consideration of the needs of the fifth, sixth generation of large ocean going container ships and 200 thousand ton bulk carriers carrying the tide through the Yangtze River estuary.
A. error
B. correct
Full marks: 3
6. because of the large surface area of the corrosive medium, the structure of the pile foundation beam and slab structure of deepwater wharf is so damaged that the durability of the structure is affected.
A. error
B. correct
Full marks: 3
7.. Artificial islands on the sea are islands or marine structures built to meet the needs of marine development, marine living and maritime tourism.
A. error
B. correct
Full marks: 3
The 8. Gorges project the Jingjiang River flood control standards to improve the current situation of 50 years once qiannianyiyu to.
A. error
B. correct
Full marks: 3
9. the cost of the tension leg platform varies little with the increase of water depth.
A. error
B. correct
Full marks: 3
10. the main factors controlling the progress of the middle route project are the the Yellow River project in the Danjiangkou reservoir reset