网站大量收购独家精品文档,联系QQ:2885784924

提高苗木成活率(国外英语资料).doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
提高苗木成活率(国外英语资料)

提高苗木成活率 Construction technology in improving the survival rate of flowers and trees are often four links A high quality greening project requires not only excellent design scheme, but also excellent construction team to make the design a reality, and also can not do without the careful maintenance management at the later stage. The greening project is mainly based on planting trees and grass, and raising the survival rate of flowers and trees is an important guarantee for the success of afforestation projects. To improve the survival rate of flowers and trees, we must do the following four aspects: I. prospecting. Only by doing a good job of topographic survey and making clear the scene, can the local conditions be followed and the design work done in a clear way. As is known to all, in urban construction projects, it is often necessary to build and then to afforest. Therefore, topographic investigation is more necessary. Underground facilities, water, electricity, pipe line layout, architectural barriers, rubbish pits, pits, have detailed records. Where suitable for Yang resistant tree species, where should be planted alkali resistant plants, all need to be properly arranged. Two, design. The excellent design scheme is the premise of the projects success, so it is necessary to take into account both the scientific and artistic nature. Digging lakes, piling mountains, landscaping, must be in accordance with local conditions, according to flowers and trees habits, suitable for trees, scientific and rational plant configuration. Three, construction. No matter how excellent design scheme, choose how expensive flowers and trees, if the survival rate is low, it is tantamount to paper. In construction, it must be carried out in a planned, organized and step-by-step way. 1. site preparation and filling. First clean the rubbish, pond after filling to reinforce. Secondly, soil fertilizer, and do mix rake rake fine. Finally, according to the needs of the project to do topogr

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档