- 1、本文档共18页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
机械的安装(国外英语资料)
机械的安装
Chapter 1 General Provisions
The first section applies to the installation of pumps listed in each chapter.
Second, this article is the pump installation engineering technical specifications, installation engineering general technical requirements, should be in accordance with the provisions of this book the first book General Provisions of the implementation.
Third pumps that are not included or have special requirements shall be carried out in accordance with the technical documents of the equipment.
The following review should be made before the fourth pumps are in place:
First, the size, location and elevation of the foundation shall comply with the design requirements;
Two, equipment should not be missing parts, damage and corrosion and so on, the nozzle protection and cover should be in good condition;
Three, the turning gear should be flexible, no block, stuck phenomenon, no abnormal sound.
Fifth, the factory has been assembled, debugged parts should not be removed at will. When it is necessary to disassemble, it should be carried out in conjunction with the departments concerned, and the disassembly and re assembly shall be carried out according to the technical documents of the equipment.
The leveling of the sixth pumps shall meet the following requirements:
Horizontal and vertical pumps shall not exceed 0.1/1000 in horizontal and vertical pumps. The machined surface shall be used as the basis for measurement;
Two, the small overall installation of the pump, there should be no obvious deviation.
The alignment of the seventh pumps shall meet the following requirements:
A drive shaft is connected to the driven shaft by the coupling, different axis, two axis coupling between the end faces of the gap should be specified in the technical documentation in accordance with the provisions of such equipment; no equipment technical documents, shall meet the requirements of this specification 1 General Provisions;
Two, when the driving shaft and the driven shaft
您可能关注的文档
- 扫金工艺的特征及应用市场(国外英语资料).doc
- 扬州大学(国外英语资料).doc
- 扳金指导书(部分)(国外英语资料).doc
- 找工作心得分享——尤其为大三&研一的同学(国外英语资料).doc
- 技巧专家解析冷车弊病(国外英语资料).doc
- 技术分析的核心秘密在于思维模式(国外英语资料).doc
- 技术分析技巧(国外英语资料).doc
- 技术经济重点(国外英语资料).doc
- 技术试验题(高考专题复习(国外英语资料).doc
- 技能安全知识(国外英语资料).doc
- B-TrunC TM 02.006.02 基于LTE技术的宽带集群通信(B-TrunC)系统(第二阶段)终端设备测试方法 第2部分:宽带数据 V1.0_012245.pdf
- B-TrunC TM 02.008.02 基于LTE技术的宽带集群通信(B-TrunC)系统(第二阶段)核心网设备测试方法 第2部分:宽带数据 V1.0_012747.pdf
- B-TrunC TM 02.003.02 基于LTE技术的宽带集群通信(B-TrunC)系统(第二阶段)接口测试方法 基站与核心网间接口 第2部分:宽带数据 V1.0 _011827.pdf
- B-TrunC TS 02.012 基于LTE技术的宽带集群通信(B-TrunC)系统(第二阶段)调度台设备技术要求 V3.0_045531.pdf
- B-TrunC TS 02.014 基于LTE技术的宽带集群通信(B-TrunC)系统(第二阶段)定位业务技术要求 V2.0_121540.pdf
- B-TrunC TS 02.013 基于LTE技术的宽带集群通信(B-TrunC)系统(第二阶段)多媒体消息业务技术要求 V2.0_121442.pdf
- B-TrunC TS 01.006 基于LTE技术的宽带集群通信(B-TrunC)系统(第一阶段)网络设备技术要求 V3.0_112854.pdf
- B-TrunC TM 02.007.01 基于LTE技术的宽带集群通信(B-TrunC)系统(第二阶段)基站设备测试方法 第1部分:集群 V3.0_033843.pdf
- B-TrunC TM 02.014 基于LTE技术的宽带集群通信(B-TrunC)系统(第二阶段)B-TrunC与非B-TrunC集群系统间互联互通测试方法 V2.0_114856.pdf
- B-TrunC TM 02.004.02 基于LTE技术的宽带集群通信(B-TrunC)系统(第二阶段)接口测试方法 核心网间接口 第2部分:宽带数据 V2.0_113058.pdf
文档评论(0)