- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
高速铁路维修养护及其设备概述(国外英语资料)
高速铁路维修养护及其设备概述(国外英语资料)
The analysis and comparison of seamless circuit in construction technology and technology economy is laid out by the shallow speaker rail transit method and single pillow continuous method
High-speed rail seamless line, in fully meet for railway passenger transport fast, safe, comfortable, convenient and reliable demand on time and at the same time, also greatly improve the competition ability of the railway, is a technical decision of railway development in our country, also accord with the trend of the worlds railway development.
Following an overall acceleration of seamless construction technology are also gradually improve, seamless track laying methods mainly include single pillow laying seamless line continuation method (hereinafter referred to as single pillow continuous law) and in the long rail laying seamless line method (hereinafter referred to as the shop in law), the article will combine existing lines to build two construction methods in the second line in making some analysis and construction technology and technical and economic comparison.
The main characteristics of long steel rail laying
The main feature of the long steel rail in the changing berth method
(1) the main construction technique of the change of laying method
Use tools to track assembled at PuJia base 25 m rail section, engineering train section rail transport to the site of track-laying engineering line, the use of track-laying machine laying 25 m rail section, when laying tool rail reaches a list of long rail length of conductor rail, rail transporter will factory welding long rail unloading to the new line of ballastless shoulder on both sides, the scene using aluminium heat welding will be 500 m long rail rail welding into 1500 m units, machine to raise standards after the track detection, ballast bed resistance standard, after the lock on the rail temperature when the demolition of the new shop section length 1500 meters on the unit and rail fasteners withi
文档评论(0)