- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2012市政真题答案(外国英语资料)
2012市政真题答案
Individual choice questions (1 points per game, 20 questions, total score of 20 points):
1 option: gravity type
P42: gravity retaining wall relies on the weight of the wall to resist lateral thrust (earth pressure) of the soil behind the wall, so as to maintain the stability of the soil.
2: option: deformation
P5: (Li Qing) pavement indexes: carrying capacity, smoothness, temperature stability, skid resistance, water permeability and noise.
3, options: first fast, then slow
P16: Soil Subgrade Compaction principle: first light, heavy, static, after vibration, first low, back high, first slow, fast, wheel overlap.
4: option: bending tensile strength 40%
P36: after the concrete reaches the designed flexural tensile strength of 40%, it can allow pedestrians to pass.
5, options: angle less than 60 degrees should be set or hanger lifting pole
P68: when lifting and placing, the strength of concrete should not be less than the design requirements of lifting strength, generally should not be less than 75% of the design strength. The strength of the cement slurry of the duct shall not be lower than the design requirement of the component. If the design is not required, it shall not be less than 30MPa. P69: the angle of the lifting rope and the lifting component is less than 60 degrees, should set the hanger or lifting pole, try to make the vertical stress rings.
6: optional: every day should observe the box culvert board to set the observation pin Gao Cheng
P80: should avoid rain of construction, if in the period of construction, must do a good job of flood control and rain drainage work.
When the force reached 0.8 times the weight of the structure when the box culvert is not started, should immediately stop jacking.
P81: the height of the observation nails shall be set on the bottom board of the box culvert every day.
7 option: shield method
P90: in the loose aquifer and ground structures are not allowed to demolition, construction difficult conditions with lots o
您可能关注的文档
- 11秋学期南开大学《管理心理学》在线作业(外国英语资料).doc
- 3d max 快捷键(外国英语资料).doc
- WS卫生标准目录(外国英语资料).doc
- 3DMAX 设备修改器集敕令面板 :室内设计 最多最常用到的敕令(外国英语资料).doc
- Cad2007快捷键大全(外国英语资料).doc
- 《分析化学B》第4次作业答案(外国英文资料).doc
- 《工程力学》试卷(B)(外国英文资料).doc
- 《电工学A》(含实验内容)教学大纲(外国英文资料).doc
- 丰宁坝上草原自驾游注意事项(外国英语资料).doc
- 《赤壁赋》历代名家点评(外国英文资料).doc
- 2012会计继续教育考试试题及答案(外国英语资料).doc
- 2012年教师竞争上岗演讲稿(外国英语资料).doc
- 2012秋季-华师在线 学生计算机作业 84分(外国英语资料).doc
- 2012年秋季基础会计学网上作业2(外国英文资料).doc
- 201309浙大病理作业及答案2014夏考 护理专科(外国英语资料).doc
- 2013年春季基础会计学网上作业1(外国英语资料).doc
- 2011年过程设备设计复习题及答案(外国英语资料).doc
- 2013年秋福师《心理学》在线作业一(外国英语资料).doc
- 2014 太阳部落攻略(外国英语资料).doc
- 2013最新国家标准公文格式(外国英语资料).doc
文档评论(0)