- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
地基土处理(外国英语资料)
地基土处理(国外英文资料)
Method and construction technology of bad foundation soil, treatment and reinforcement
Substitution method
(1) replacement method
It is to dig out the bad foundation soil of the surface layer, and then backfill the soil with better compaction characteristics to compaction or tamping, and form a good bearing stratum. Thereby, the bearing capacity characteristics of the foundation can be changed, and the deformation resistance and stability can be improved.
Construction points: the soil layer to be converted, pay attention to the stability of the pit; to ensure the quality of the filling; filling should be layered and compacted.
(2) vibro replacement method
By using special vibratory machines and tools, under the high pressure water jet, the edge of the edge is washed and made into holes in the ground, and then piles of gravel or gravel are formed in batches to form a pile body. The composite foundation is made up of the pile body and the base soil in order to improve the bearing capacity of the foundation and reduce the compressibility.
Note: the construction of gravel pile bearing capacity and settlement largely depends on the in-situ soil lateral constraints on it, the constraint effect is weaker, the effect of gravel pile is worse, so the method for soft clay strength is very low when must be careful.
(3) tamping (extrusion) replacement method
The pipe (hammer) is put into the soil by means of an immersed tube or a rammer, so that the soil is pushed to the side, and the gravel or sand is filled in the pipe (or tamping hole). The pile and soil in composite foundation, the soil compaction due to extrusion, lateral extrusion, surface uplift, soil pore water pressure increases, when the dissipation of excess pore water pressure after the soil strength is also a corresponding increase.
Construction note: when the filling is good permeability of sand and gravel, it is a good vertical drainage channel.
Two, preloading method
(1) surcharge preloading method
您可能关注的文档
最近下载
- TBNCY002-2023 西双版纳红茶 晒红茶.pdf VIP
- 机关单位人力资源管理中存在的问题及解决对策.docx VIP
- 2025年中级(四级)营销员职业技能鉴定《理论知识》真题卷(后附答案及解析).pdf VIP
- 大数据概论教学课件.pptx VIP
- 西双版纳红茶 晒红茶.docx VIP
- 室内装修全工程施工方案(3篇).docx VIP
- 2025年卫生事业单位招聘考试(中医学基础知识)历年参考题库含答案详解(5卷).docx VIP
- 50个广告分析.doc VIP
- GB32030-2022 潜水电泵能效限定值及能效等级 (2).pdf VIP
- (语文)福州时代中学2020级初一新生入学检测.pdf VIP
文档评论(0)