监理员培训(外国英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
监理员培训(外国英文资料)

监理员培训(国外英文资料) To check the division, division, division, unit engineering division and acceptance The concept of batch, branch, branch and unit engineering Inspection batch: to be collected in accordance with the same production conditions or in accordance with the prescribed manner, the inspection body consisting of a certain number of samples. Partial engineering: a basic unit project consisting of one or several inspection batches Division project: refers to the division of the unit project into a number of parts in the professional or construction parts, each part of the project Unit engineering: in the construction project, which has an independent design files, can play an independent production capacity after the completion of engineering or engineering benefit, and can constitute a part of the construction project Check the approval of batch, branch, branch and unit project Batch of inspection: The inspection batch is the minimum unit of project acceptance, which is the basis for the quality acceptance of the project and the construction project. There are two aspects to verifying the qualified quality of the batch: data inspection, master project inspection and general project inspection. Quality control data reflects the inspection batch from raw material to final acceptance of the construction process of operation, necessary to check the situation and ensure the quality management system, etc. The inspection of its integrity is actually a confirmation of process control, which is a prerequisite for verifying the approval of the batch. The qualified quality of the inspection batch shall depend on the test result of the main control project and the general project. The main control project is a test project that determines the fundamental quality of the inspection batch, and therefore must comply with the relevant regulations of the relevant professional engineering. This means that the master program does not allow for the test results that do not meet the

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档