- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
上海吴淞路闸桥(国外英文资料)
上海吴淞路闸桥(国外英文资料)
Wusong Road gate bridge (the original project name for the Suzhou River Gate Bridge) project started in October 1988, opened in April 30, 1991. The total project investment of about l billion yuan (excluding bridge part) project construction unit of Shanghai City, the Yangtze River Estuary Development Bureau, former Shanghai Municipal Water Conservancy Bureau, jointly designed by Shanghai municipal engineering design and Research Institute of water conservancy and Hydroelectric Power Survey and Design Institute of Shanghai, by the Shanghai shipyard, the Ministry of transportation company two measurement etc. the construction unit, the management unit is in Shanghai city of Suzhou River department.
Wusong Road gate bridge is one of the most important flood control project in Shanghai City, her relationship with the Suzhou River in Huangpu, Hongkou, Jingan, Zhabei, Putuo, Changning, Jiading, Minhang, Qingpu and other 9 regions nearly 3 million peoples safety in flood season. The gate bridge is an L level of hydraulic structures, design flood defense standards for 1000 years (Suzhou Huangpu River estuary water level 5.90 meters), the gate design on both sides of maximum water level difference of 3.30 meters (5.90 meters upstream and downstream of the gate 2.60 meters combination). When the water level reaches 4.70 meters and above, the flood control headquarters of Shanghai city issued the command of blocking tide and blocking the tide.
The floodgate is a single hole with a diameter of 60 meters and adopts a combination of locks and bridges. The main bridge is 142.67 meters long and has a full welded steel structure. The bridge design load over 20, hang 120, l ramp up 5 lanes, greatly easing the original Waibaidu Bridge traffic bottleneck, and create conditions for gas, tap water, electricity, communications and other four major pipelines across the river. The gate hoist winch, from the consideration of landscape design for the 17 fan gate plate type s
您可能关注的文档
- printf输出各种格式(国外英文资料).doc
- protel99se秘籍(国外英文资料).doc
- protel应用常见问题(国外英文资料).doc
- Protel技术论谈(国外英文资料).doc
- Prototype的深度探索(国外英文资料).doc
- pro_tools快捷键(国外英文资料).doc
- PS_cs5快捷键大全(国外英文资料).doc
- PS一些常用的快捷键(国外英文资料).doc
- PS中各个工具的使用方法与技巧(国外英文资料).doc
- ps广告分辨率的问题(国外英文资料).doc
- 2025年天津市冷链物流基地配套道路建设可行性研究报告.docx
- 2025年天津市母婴护理会所专业化服务升级路径可行性研究报告.docx
- 2025年成都市私立医院医美抗衰中心创建可行性研究报告.docx
- 2025年成都市淡化海水在城市道路清洗领域的应用可行性研究报告.docx
- 2025年上海市环卫厨余垃圾生物处理技术应用可行性研究报告.docx
- 2025年天津市花西子针对户外运动妆容的可行性.docx
- 2025年上海市生物发电于秸秆炭化还田协同发电的可行性研究.docx
- 2025年天津市物造纸在可降解农用地膜领域的应用可行性研究报告.docx
- 2025年天津市无人值守充电站智能运维可行性研究报告.docx
- 2025年天津市竹荪种植连作障碍防治技术可行性研究报告.docx
文档评论(0)