不锈钢压接管技术指导(国外英文资料).docVIP

不锈钢压接管技术指导(国外英文资料).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
不锈钢压接管技术指导(国外英文资料)

不锈钢压接管技术指导(国外英文资料) Stainless steel clamping pipe fittings and stainless steel pipe installation technical disclosure book In order to make the stainless steel pipe in the installation and use in order to ensure the safety and quality of the use of stainless steel In the construction of pipelines, the technical performance, characteristics and installation methods of stainless steel pipes will be necessary before construction The technical supervisor of the construction party and the operator shall make technical clarification and sign the document for future reference. The technical disclosure is in the cecs153:2003 building water supply thin-walled stainless steel pipe pipe project technical regulations. On the basis of it, the induction and summary are summarized, and the key points in the operation are emphasized. Where technical disclosure book Not involved in the content, all according to cecs153:2003 building water supply stainless steel pipe pipe project technical regulations to implement. Installation operation points First, broken pipe First, pipe cutter tube in accordance with the construction size cut, with a special stainless steel file or angle grinder to remove cut Cutting surface burr, cut the pipe should make the pipe cutting surface and the pipe central line vertical, pipe end and appearance should be smooth and smooth Clean and oil-free. Two, connection preparation Mark the end of the end of the tube with a special scribe for a week to confirm the length of the pipe and the length of its insertion The reference values are shown in the following table: Nominal DN: insertion length of the basic value (mm): card pressure (MPA) Note: 152135-40 202440-45 252445-50 323945-50 403745-50 505250-55 655335-55 the first pressure is 35; Second times the pressure reaches 45; Third times the pressure reaches 55; Turn 35 degrees each time. 806035-60 the first pressure is 35; Second times the pressure reaches 45; Third times the pressure reaches 60; Turn 35 degree

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档