探究房地产企业加强工程质量控制的措施(国外英文资料).docVIP

探究房地产企业加强工程质量控制的措施(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
探究房地产企业加强工程质量控制的措施(国外英文资料)

探究房地产企业加强工程质量控制的措施(国外英文资料) Probe into measures for strengthening quality control of real estate enterprises Since its opening from China, Chinas economy is growing at an alarming rate, especially in the decades of reform and opening up. The construction industry has a very significant stimulating effect on the economic development. Construction has always placed the quality of the project in the first place, and the quality of the building is closely related to the lives of the people, and it determines whether the building is good or bad. Recently, the quality of the project has been widely discussed by people, because of the floor, fragile building and a series of problems, the real estate project quality has become the must face the problem. First, to explore the existing quality control of construction projects 1. foreign situation analysis In 1961, scholar Feigenbaum America proposed a quality management theory, the theory is comprehensive, quality control of the United States and European countries the construction project includes the following three aspects: (1) contractors of construction engineering have a high degree of self checking consciousness, and they are very strict and have corresponding quality assurance. (2) quality supervision and inspection in construction engineering. (3) government participation. The participation of the government can be in the form of laws and regulations to stipulate the corresponding category system, especially for the construction of large public buildings, usually set up some corresponding inspection and supervision of staff, from time to time to check on the building. 2. domestic situation analysis (1) the construction law of the peoples Republic of China began to be promulgated in 1998, which provides the corresponding legal basis for strengthening the supervision and management of construction activities and sound development. (2) in 1978, China began to implement the corresponding quality management in full swing.

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档