浅谈桩基工程钻孔施工技术(国外英文资料).docVIP

浅谈桩基工程钻孔施工技术(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
浅谈桩基工程钻孔施工技术(国外英文资料)

浅谈桩基工程钻孔施工技术(国外英文资料) China Engineering Construction Network Your current location: home page Discussion on drilling construction technology of pile foundation engineering In recent years, with the continuous improvement of pile quality, pore speed and construction and environmental protection, some medium and small rotary drilling rigs have been springing up, and more and more attention has been paid by construction workers. The pile or bucket pile, soil pile rotary drilling rig, the overlay construction has good hole quality, fast speed, no noise, no pollution or less pollution and other advantages, for dry hard clay, not static stable liquid mud wall, general overlay with mud. Because of the vast area and complicated geological conditions in our country, the drilling technology must be targeted in the construction of rotary drilling rig to prevent construction accidents such as buried drilling, collapse and so on, so as to avoid losses. In this paper, the construction project of Pudong pile foundation engineering construction case into hole combined with Zhejiang Shunjie Construction Group Limited, how to avoid collapse and burying accidents on construction experience of rotary drilling process, in order to provide the reference to construction. I. General Situation of the project Zhejiang Shunjie Construction Group Co., the construction of a project in Pudong, the total amount of pile 2180 pile type pile, pile diameter, pile diameter of 800 mm, 36 meters deep. The swamp area, about 2 meters for a small amount of construction waste backfill layer, 2 ~ 5 meters for 5 ~ 13 meters of clay soil, sub clay layer, 13 ~ 15 meters of sand, 15 ~ 29 meters sub clay, 29 ~ 34 meters for 34 ~ 36 meters of sand, clay layer. Two, pore forming process The rotary drilling machine is used to drill holes into soil, and the pile forming technology is as follows: setting the pile location, burying the retaining tube, injecting mud, drilling the soil once, clearing the hole once, placi

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档