- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
系统集成项目管理工程师练习三(国外英文资料)
系统集成项目管理工程师练习三(国外英文资料)
This article is contributed by janiphen
DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
1 is not the key technology of J2EE. B.RMI/IIOP (4) A.JSP [2] is a specialized modeling language. A.XML B.UML
C.ASP
D.EJB
C.VC++
D.JAVA
(3) it is the process method of information system development. A.EGP B.RUP C.RIP
D.BGP
The 802.11 standard defines 3 physical layer communication technologies, these 3 techniques do not include (4). A. direct sequence spread spectrum frequency hopping spread spectrum B. C. narrowband microwave D. diffuse reflection infrared - December 2005, ISO officially released as IT service management international standard; in October 2007, ITU accepted as 3G standard; in October 2005, ISO officially released as an international standard for information security management. One, two and three are (5). A. ISO27000 IEEE802.16 ISO20000 B. ISO27000 2 3 2 3 IEEE802.16 C. ISO20000 ISO20000 IEEE802.16 ISO27000 D. IEEE802.16 2 3 2 ISO20000 3 ISO27000 - RSA algorithm on the narrative is not true (6). A. RSA algorithm is a symmetric encryption algorithm, C. RSA algorithm can be used for some kind of digital signature scheme degree
The operation speed of B. RSA algorithm is slower than that of DES, and the security of D. RSA is mainly based on the difficulty of prime factorization
The following are not part of Middleware Technology (7). A., Java, RMI, B., CORBA, C., DCOM, D., Java, Applet [8] should specify the scope of the shutdown and the conditions and time for possible resumption of work. The general supervision engineer according to its engineering work order issued to the contractor, the project will be coordinated through the sign resolution copy attached. A. negotiation letter B. supervision notice C. notify D. project progress report the authority granted by the employer to the supervision unit should be clearly reflected in (9), wher
文档评论(0)