- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
防腐木施工(国外英文资料)
防腐木施工(国外英文资料)
Before the construction of the preservative wood, the civil works must be completed and must be cleaned up. The quality of the ground construction must meet the design requirements of the building drawings. Decorative ceiling, ultrasound, electro acoustic, lighting and other may affect the project to the end of the wood preservative before construction, so as to avoid the cross construction of anticorrosive wood construction and maintenance to avoid impact; other types of cross construction, such as mixed construction should avoid dirty wood preservative.
1, the fixed laying floor laying norms laid indoor reference; laying activities: screw on screw can be screwed into the opposite; in strict accordance with the design drawings of Party A to do the construction, technology and other issues to communicate with Party supervision.
2, keel spacing is generally transverse to the longitudinal 30CM and 50CM (determined by wood thickness), keel spacing not more than 50cm; the outdoor platform / Terrace overall heightening construction operations, the height of more than 50cm, foundation must be further strengthened. Play stakes must be strong, but also the site geological conditions, the best use of concrete pouring; wood preservative should be kept between joint 0.2-1CM (depending on the specific circumstances of the customer requirements), wood preservative to pre drilled screws to align side-by-side, cutting part or outdoor wood walls preservatives protection coatings.
3, hardware in addition to stainless steel, copper and hot-dip galvanizing, the other should be painted with anti rust paint.
4, part of the wood structure should also do the drainage treatment: if the wood keel touches the ground, against the flow direction to do the drainage hole, and then repair and outdoor paint brush preservatives.
5, serious surface cracking off problems and other issues the board should be reasonable cut off and repair the filling mode.
6, Party A has not put forward
您可能关注的文档
最近下载
- 2024-2025学年初中英语六年级上册(2024)鲁教版(五四制)(2024)教学设计合集.docx VIP
- 结构力学仿真软件:OpenSees:风工程与OpenSees仿真技术.pdf VIP
- 排水管网工程项目监理与验收.docx VIP
- 水产养殖生产管理记录表.doc VIP
- 商业合作计划书.docx VIP
- 2024部编版小学5五年级《道德与法治》上册全册教案设计.pdf VIP
- 2023年CCF非专业级别软件能力认证第一轮CSP-J1入门级C++语言试题.pdf VIP
- 投标文件关键项检查清单(编制要求及检查清单)模板.xlsx VIP
- 硅光电池PPT课件.pptx VIP
- 结构力学仿真软件:OpenSees:高层建筑结构分析教程.pdf VIP
文档评论(0)