Neither Party shall be liable to the other Party for loss of use of any Works, loss of profit, loss of any contract or for any indirect or consequential loss or damage which may be suffered by the other Party in connection with the Contract, other than under Sub-Clause 16.4 (Payment on Termination) and Sub-Clause 17.1 (Indemnities). The total liability of the Contractor to the Employer, under or in connection with the Contract other than under Sub-Clause 4.19 (Electricity, Water, Gas and Communication), Sub-Clause 4.20 (Employer‘s Equipment and Free-Issue Material), Sub-C
您可能关注的文档
- 第五章化学动力学教程.ppt
- 第一节地理环境对区域发展的影响整理版教程.ppt
- 7租赁案例分享选读.ppt
- 8、第八章电液伺服执行机构选读.ppt
- 第一节地文景观类旅游资源教程.ppt
- 第五章化学概述教程.ppt
- 第五章环境侵权与环境民事责任教程.ppt
- 第五章环境噪声影响评价教程.ppt
- 第五章环境资源法律责任教程.ppt
- 第一节第1课时化学实验安全教程.ppt
- 湖南省长沙市雅礼中学2025-2026学年高三下学期开学政治试卷含答案.pdf
- 成都市经开区实验高一入学数学分班考试真题含答案.docx
- 2025消防员专项测试卷含答案.docx
- 2025春季小学三年级语文期中测试.docx
- 2026年春江苏开放大学园林工程清单计价060512园林工程清单计价形成性考核作业一答案.pdf
- 2025年高一化学春季版试卷.docx
- 2025年甘肃嘉峪关市中考数学试卷含答案.docx
- 2026年春江苏开放大学智慧化税费申报与管理060945第3次任务答案.pdf
- 成都市二中高一数学分班考试真题含答案.docx
- 2026年春江苏开放大学统计学第二次形成性考核答案.pdf
原创力文档

文档评论(0)