坑外搅拌桩加固对基坑变形的影响分析(国外英文资料).docVIP

坑外搅拌桩加固对基坑变形的影响分析(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
坑外搅拌桩加固对基坑变形的影响分析(国外英文资料)

坑外搅拌桩加固对基坑变形的影响分析 Analysis of the influence of pit mixing pile reinforcement on the deformation of foundation pit Abstract: in the construction of soft soil foundation pit, because of the subway shield entering and leaving the hole, and in order to protect the building around the foundation pit and other reasons, often outside the pit reinforcement. The reinforcement outside the pit will increase the strength of the soil, and will also affect the deformation of the foundation pit. Combining with a subway station in Shanghai at the end of the reinforcement project, analysis of pit pile strengthening the negative impact on the deformation of foundation pit, and on this basis put forward some reduced reinforcement outside the pit impact control measures, hope to provide reference for future similar projects. Key words: mixing pile reinforcement; squeezing effect; foundation pit displacement; construction technology 0 Introduction The reinforcement of mixing pile is widely used in underground engineering in soft soil area because of its flexible layout and obvious reinforcement effect. [1]. However, the negative effects have not been paid attention to. The mixing and strengthening of the retaining wall in the entrance and exit of the shield tunnel will affect the lateral displacement and the deformation of the retaining wall of the underground wall. Especially when the construction of mixing pile and foundation pit is simultaneous, the influence caused by unreasonable factors such as construction sequence and construction cycle is more obvious, and even endanger the safety of foundation pit. Therefore, good coordination of shield tunnel excavation or internal mixing pile construction process and processing is very important, should fully consider the influence of strengthening construction of underground station wall displacement pile, when necessary to take a more safe and reasonable reinforcement construction technology. Based on the actual engineering, according to

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档