变压器装配工艺(国外英文).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
变压器装配工艺(国外英文)

变压器装配工艺(国外英文资料) With the rapid development of the power industry, a large number of power plants and substations have come into being. As the main electrical equipment of power plant and substation, the installation quality of transformer directly affects the safe operation of power grid. Therefore, the field installation technology of transformer is becoming more and more important. In this paper, starting from the actual construction, talk about 220kV power transformer on-site installation technology for reference to the working hours. 1 check the main transformer before installation (1) on the internal inspection of transformer, to be with good oil pipeline and pumping pipeline, pipe is the best galvanized seamless steel pipe, pipe internal to the derusting treatment before use clean heat transformer oil. (2) check whether the main body is affected with dampness. With oil transportation products, check the tank seal. The test of oil samples, and the detection coil insulation resistance and breakdown voltage, when the oil 50kV, 20 x 10-6, the rate of water coil insulation resistance and absorption ratio of R60 R60 / R15, the dielectric loss and the factory value has no obvious change, is considered not to be affected with damp. For moisture affected products, they should be dried when installed. 2 conditions for body inspection (1) when rain, fog or sand wind weather or relative humidity is greater than 75%, no body inspection can be carried out. (2) before the examination will be the best body temperature above the ambient temperature is heated to 10-15 DEG C (available hot oil circulation heating oil with U is larger than 50kV, the water content of 15 x 10-6, 90 DEG C when the dielectric loss of 0.5%.. (3) in the outdoor hanging hood inspection products, as far as possible to build temporary dust fence (with plastic sheeting), the wall is higher than the tank. 3 body check (1) inspection under normal conditions. Under normal circumstances, the 220kV transformer

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档