- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
铁路知识2(国外英文)
铁路知识2(国外英文资料)
2, the conflict: refers to trains, locomotives and vehicles (including rail crane, the same below), EMU, heavy rail car with each other or with the device (such as a garage, station, car etc.), light-duty vehicle collision, vehicle, vehicle and locomotive incur heavy rail car damage.
Delay the train: refers to the train stop in the interval; by train in the station parking; the train at the departure station or stop open late, more than the figure given parking time or dispatcher specified time; train outage, merger, retention. 1. how is the classification of stations prescribed? A: the station can be divided into passenger station, freight station and freight station according to its business nature. The station is divided into marshalling station, section station and intermediate station according to the technical operation.
2. how are railway lines classified? Answer: the railway line is divided into line, line segment, pipeline, branch line and special line.
3. what should the train station operators do to participate in the shunting operation? Answer: (1) in a timely manner, and ensure the disintegration of the train marshalling train diagram according to the provisions of the time of departure, does not affect the vehicle; (2) timely delivery of cargo operations and maintenance of vehicles; (3) make full use of the shunting locomotive and all technical equipment, using advanced methods of work, to complete the task with the least time shunting; (4) seriously implement the operation standard, ensure shunting relevant personnels personal safety and traffic safety.
4. what key link must the shunting operation die on? Answer: shunting operation must be stuck in nine key links: leadership, command, plan, connection, inspection, confirmation, signal, speed and lookout.
5. what is the nine fixation of shunting work? Answer: fixed shunting operation area, line usage, shunting locomotive, personnel, shift number, handover time, handover location, quantit
文档评论(0)