浦上大桥单索斜拉桥斜拉索施工技术.pdfVIP

  • 8
  • 0
  • 约8.17千字
  • 约 5页
  • 2017-07-05 发布于河南
  • 举报

浦上大桥单索斜拉桥斜拉索施工技术.pdf

浦上大桥单索斜拉桥斜拉索施工技术

50 2007 1 : 1003- 4722(2007) S1- 0050- 05 章国平, 陈潇曦 ( 中铁大桥局集团第二工程有限公司, 江苏 南京210015) : 福州浦上大桥主桥为364 m 的三塔单索斜拉桥详细阐述该桥斜拉索的挂设方法和 工工艺 : 斜拉桥; 斜拉索; 桥梁 工; 工技术 : U443. 38 : A Construction Techniques for Stay Cables of Single Cable CableStayed Bridge of Pushang Bridge ZHANG Guop ing, CHEN X iaox i ( The 2nd Engineering Co., td., China Zhongt ie Major Bridge Engineering Group, Nanjing 210015, China) Abstract: T he main bridge of Pushang Bridge in Fuzhou is an single cable cablestayed bridge with a main span 364 m and with triple pylons. In this paper, the construction methods and tech nology for installation of the stay cables of the Bridge are described in details. Key words: cablestayed bridge; stay cable; bridge construction; construction technique 1 2 72 m+ 110 m+ 110 m+ + + + 72 m ( ) , 364 m( 1) + + + + , , + ( 2) , 2. 1 , 8 , 40. 5 m, 5515. 24, ( 1) , , , b Ry = 1 770 MPa (2) : O ( 3) : , , 1 (4) : , , : 2007- 03- 15 : ( 1976- ) , , , 1997 , 51 2 2.2

文档评论(0)

1亿VIP精品文档

相关文档