09年二级建造师水利水电管理与实务练习题汇总(国外英文资料).docVIP

  • 3
  • 0
  • 约1.8万字
  • 约 17页
  • 2017-07-05 发布于河南
  • 举报

09年二级建造师水利水电管理与实务练习题汇总(国外英文资料).doc

09年二级建造师水利水电管理与实务练习题汇总(国外英文资料)

09年二级建造师水利水电管理与实务练习题汇总 09 year two construction division water conservancy and hydropower management and practice exercises (1) 1. according to the technical specification for construction of underground excavation of hydraulic structures (DL / T5099 - 1999), blasting materials shall conform to the construction conditions and technical standards. The performance tests must be carried out before each batch of blasting material is used. The A. industry provides that the B. states require the C. government to specify the D. design requirements 2. according to the technical specification for construction of underground excavation of hydraulic structures (DL / T5099 - 1999), the distance from the safe place to the blasting face shall be no less than (). A.50m B.100m C.150m D.200m 3. according to the hydraulic structure of underground excavation engineering construction technical specification (DL / T5099 - 1999), two working face in the opposite direction from the excavation () or () times the diameter distance when shooting, the two sides are required to evacuate personnel working face. A.30m, 5 B.25m, 5 C.30m, 3 D.25m, 4 4. according to the technical specification for construction of underground excavation of hydraulic structures (DL / T5099 - 1999), two sides of the excavation shall be separated from each other, A.15m B.12m C.10m D.8m 5. in accordance with the technical specifications for blasting construction of hydropower and water conservancy projects (DL / T5135 - 2001), the location, structure and facilities of blasting equipment, storage and storage rooms must be approved by the competent authorities and approved. A. quality supervision department, B., local public security department, C. project, legal person, D. supervision unit 6. according to the water conservancy and hydropower project construction organization design specification (SL303 - 2004), construction organization design, a cofferdam protection for the special requirements of the 1 permanent hydrau

文档评论(0)

1亿VIP精品文档

相关文档