- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
带式输送机产品质量计划英文概要1
Inspection Test Plan of
Belt conveyor
General
This plan specifies belt conveyor quality objectives in the product realization process during different stages, aimed at effectively controlled quality in the product realization process of each stage and ensures the quality of products to meet customer requirements.
This plan is suitable for belt conveyor product general quality plan. For a special contract or customer for some terms with special needs, we deal with relevant clause to be amended by technology, informs to each executive branches as a product quality planning attached documents.
Responsibility
2.1The sale department transfer contract information to technology department.
2.2The technology department design the customer need and amend product quality plan.
2.3Allrealtive departments and manufacturing department carry out and control the quality plan.
The quality plan control specification
3.1The technology department carry out as《Design and develop control Procedure》
3.2The purchasing department carry out as《purchasing Control Procedures》
3.3purchased and raw materials should be inspected as《Raw material and Purchased products works Inspect Procedures》
3.4 Quality Control of Special Procedures
3.4.1Heat Treating procedure
1)Drive pulley shaft hardness:217~255HB;
2)Roller brake shaft hardness:60~65HRC;
3)Roller brake insert hardness:60~65HRC;
3.4.2Welding procedure
1)Pulley shell weld seam should be as Class BⅡof GB11345-1989 or Class Ⅲof GB/T3323-2005.
2)No crack or non-penetration seam is allowed to between of pulley shell and end disc.
3)No crack, breakthrough or non-melted weld seam is allowed on steel structure.
3.5 Cooperated-parts Inspection
3.5.1 Cast steel is required as following:
1)The cast steel should be relieved stress.
2)The size should be as the technology requirement
3)The material should be as the drawing requirement
4)No crack, sand and added parts is on the appearance.
3.4.2Pulley lagging should be accorded as below
1)Rubber physica
您可能关注的文档
最近下载
- 初中英语AI辅助阅读理解能力提升策略研究教学研究课题报告.docx
- 人教版部编版统编版六年级上册语文期中复习课件.pptx VIP
- 链家大区商圈经理述职.pptx VIP
- 2025年天津市农机拆解产业园区规划建设可行性研究报告.docx
- 《反对本本主义》课件.ppt VIP
- 北师大三年级下册第七单元《小小鞋店》教学设计含教学反思 .pdf VIP
- 卫生政策学 期末复习小抄.docx VIP
- 房地产成品住房装修技术标准.pdf VIP
- 电力系统北斗短报文业务消息报文传输流程、消息报文编码示例.pdf VIP
- 考研题库 《认知心理学》(第7版)(真题 课后习题 章节题库 模拟试题).docx VIP
原创力文档


文档评论(0)