具有非线性安装时间和送出时间的单机排序问题.pdfVIP

  • 2
  • 0
  • 约4.17万字
  • 约 8页
  • 2017-07-09 发布于天津
  • 举报

具有非线性安装时间和送出时间的单机排序问题.pdf

具有非线性安装时间和送出时间的单机排序问题.pdf

Pure Mathematics 理论数学, 2017, 7(2), 61-67 Published Online March 2017 in Hans. /journal/pm /10.12677/pm.2017.72009 Single-Machine Scheduling Problems with Non-Linear Past-Sequence-Dependent Setup Times and Delivery Times Mingze Li College of Mathematics and System Science, Shenyang Normal University, Shenyang Liaoning th th th Received: Feb. 17 , 2017; accepted: Mar. 5 , 2017; published: Mar. 8 , 2017 Abstract This paper studies the single machine scheduling problems with both

文档评论(0)

1亿VIP精品文档

相关文档