- 1、本文档共3页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2011《管理与法规》91道真题答案(Managementandregulation91)
2011《管理与法规》91道真题+答案(Management and regulation 91)
Immediate effect)
10. According to the Water Law, the following is correct (plan water, water conservation; the principle of combining benefits with pesticide; new alteration of the building, to apply for water permits)
11. The relevant flood control standards (urban flood control and flood control standards can be increased or decreased; in the international river side of the need to improve the fortification standards)
12. What are the waters and other land in the classification of villages and towns (agriculture and forestry land; special land; unused land)
13. Public toilet setting (located along the road with more people flow; suitable for other environmental sanitation facilities; 5 meters around the green belt; subsidiary public toilet should not affect the main building function; can not be set in the city green )
14. occupation of land requires the approval of the State Council (vegetable production base; scientific research field; basic farmland more than 35 hectares of arable land; other 70 hectares or more)
15. A question about the revision of the floor area rate (the need to amend the control of detailed planning; to strengthen the construction of floor space rate management and supervision and inspection of the notice; to modify the necessity of proof; to seek the views of interested parties)
16. Nationally banned construction projects (urban planning area built golf course; in urban construction land to set up a new area; collective land for real estate development, basic farmland green)
17. Planning administrative penalties (revocation of licenses; to stop the construction period to correct; deadline demolition)
The answer given, to determine the problem can be q me]
您可能关注的文档
- (万科)住宅设计统一技术措施(建筑)(Unified technical measures for residential design (construction)).doc
- (建筑工程)第1章3(Chapter 1, 3).doc
- (新版)收缩膜热收缩膜生产制备工艺及应用专利技术光盘((new) shrink film shrinkage film production preparation process and application of patented technology compact disc).doc
- -平面旋转LED点阵套件-电子制作(- plane rotating LED lattice kit - electronic production).doc
- 001世界十大宫殿(001 the world's ten palaces).doc
- 0.8QQ手挡驾驶全攻略(0.8 QQ hand in the driver overall strategy).doc
- 002机械挖土施工工艺(Construction technology of mechanical excavation).doc
- 002作图题(黄冈市物理中考题调考题汇编)(002 graph (a compilation of examination questions in the physics of huanggang)).doc
- 008年石家庄市第二十八中学初三年级一模考试(In 008 shijiazhuang no.28 middle school, the first third grade a module examination).doc
- 005机械回填土施工工艺(Construction technology of mechanical backfill soil).doc
文档评论(0)