7高级电工技师理论复习题-电工考试题库-电工试题库7-百科网络(7 senior electrician technician theoretical review - electrician test - electrician test library 7 - encyclopedia network).doc
- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
7高级电工技师理论复习题-电工考试题库-电工试题库7-百科网络(7 senior electrician technician theoretical review - electrician test - electrician test library 7 - encyclopedia network)
7高级电工技师理论复习题-电工考试题库-电工试题库7-百科网络(7 senior electrician technician theoretical review - electrician test - electrician test library 7 - encyclopedia network)
senior electricians theoretical review
-
Role? How do you prevent the grounding of the protective layer?
Answer: (1) the non-grounded sheath of cable line has the inductive voltage. When the insulation of the protective layer is bad, it will cause the metal sheath ac or spark discharge to damage the metal sheath. In addition, the insulation layer has the effect of preventing chemical corrosion. (2.5)
(2) if the protection layer of insulation fault for earthing end of the cable line or cross interconnection lines, when impact over-voltage protector has not yet been action, covering insulation for weak place might be breakdown. (2.5)
(3) the cable line of the two ends of the sheath is grounded or interconnected. When the power system is connected to a single phase, the fault current is large and the circuit current in the sheath is large. Such as fault current is 6 ka, on both ends of the earth resistance even small (e.g., 0.5 Ω), when through the loop current, sheath voltage can be increased to 3000 v, if security layer insulation fault, breakdown and will be burn out sheath and strengthening belt. (2.5)
(4) covering insulation breakdown or multipoint earthing cable line will form two damage, sheath will produce circular current, thereby reducing cable current carrying capacity, so the cable line in addition to the provisions of grounding place, other parts should be grounded, sheathed good insulation must be complete, must pay attention to prevent the protective layer of insulation in the construction operation, cable sheath with metal components, or other device should be installed insulation to prevent ground, such as cable connected between terminal head base and support of four fulcrum, shall furnish insulator: cable joint casing shall be installed between the piers and insulation; The wiring between sheath
您可能关注的文档
- (万科)住宅设计统一技术措施(建筑)(Unified technical measures for residential design (construction)).doc
- (建筑工程)第1章3(Chapter 1, 3).doc
- (新版)收缩膜热收缩膜生产制备工艺及应用专利技术光盘((new) shrink film shrinkage film production preparation process and application of patented technology compact disc).doc
- -平面旋转LED点阵套件-电子制作(- plane rotating LED lattice kit - electronic production).doc
- 001世界十大宫殿(001 the world's ten palaces).doc
- 0.8QQ手挡驾驶全攻略(0.8 QQ hand in the driver overall strategy).doc
- 002机械挖土施工工艺(Construction technology of mechanical excavation).doc
- 002作图题(黄冈市物理中考题调考题汇编)(002 graph (a compilation of examination questions in the physics of huanggang)).doc
- 008年石家庄市第二十八中学初三年级一模考试(In 008 shijiazhuang no.28 middle school, the first third grade a module examination).doc
- 005机械回填土施工工艺(Construction technology of mechanical backfill soil).doc
- 福莱特玻璃集团股份有限公司海外监管公告 - 福莱特玻璃集团股份有限公司2024年度环境、社会及管治报告.pdf
- 广哈通信:2024年度环境、社会及治理(ESG)报告.pdf
- 招商证券股份有限公司招商证券2024年度环境、社会及管治报告.pdf
- 宏信建设发展有限公司2024 可持续发展暨环境、社会及管治(ESG)报告.pdf
- 品创控股有限公司环境、社会及管治报告 2024.pdf
- 中信建投证券股份有限公司2024可持续发展暨环境、社会及管治报告.pdf
- 洛阳栾川钼业集团股份有限公司环境、社会及管治报告.pdf
- 361度国际有限公司二零二四年环境、社会及管治报告.pdf
- 中国神华能源股份有限公司2024年度环境、社会及管治报告.pdf
- 广西能源:2024年环境、社会及治理(ESG)报告.pdf
文档评论(0)