网站大量收购独家精品文档,联系QQ:2885784924

助工考试建筑施工补充题目(Assistant examination supplementary title of construction construction).doc

助工考试建筑施工补充题目(Assistant examination supplementary title of construction construction).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
助工考试建筑施工补充题目(Assistant examination supplementary title of construction construction)

助工考试建筑施工补充题目(Assistant examination supplementary title of construction construction) 1. Single item selection (construction supplement), single item selection (construction supplement) 3 1. The excavation of an earthwork is 1000m, and Ks = 1.25, Ks = 1.05, which is known, and 34. Determine the construction strength of concrete, which is the target of the guarantee rate (c.95%). 3 The amount of soil to be transported is (c.1250m) 35. When mixing C40 concrete at the scene, the cements toppings should be controlled at (c. plus or minus 2%). 2. The first priority before the site formation is (B. To determine the sites design elevation). 3. The drainage method of minggou collecting well is not suitable for the project of slope (C. Fine sand soil). 4. When the precipitation depth exceeds (c. 8m), the injection well point should be adopted. 5. A light well point using circular arrangement, well pipe buried surface vertical distance from the bottom of the foundation pit is 4 m, well point pipe to the center line of the foundation pit is the horizontal distance of 10 m, the buried depth of the well point pipe (not including filter length) should be at least 5.5 m (b.). 6. According to the construction requirements of soil nail wall support, the spacing of soil nails should be (B. 1 ~ 2 m). 7. The depth of a foundation pit is large, the soil quality is poor, the underground water table is high, it is appropriate to use (D. Underground continuous wall) as the soil wall support. 8. The machinery for making site formation, excavation of foundation pit, filling trench and pine soil is (C. Bulldozer). The machine that is suitable for the dredging of the river is the (C) shovel excavator. 10. In the excavation of the foundation pit, it is incorrect to say that (B. When the soil is poor, it should adopt the principle of layering, digging and supporting. 11. Fillers should be filled with infiltration coefficient (D. Larger) when filling in different layers of soil with different per

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档