网站大量收购独家精品文档,联系QQ:2885784924

广日梯GVK.GVB.GVH.GVZ.变频调速电梯调试(GVK. Gvk.gvs.gvz. Variable frequency speed regulating elevator).doc

广日梯GVK.GVB.GVH.GVZ.变频调速电梯调试(GVK. Gvk.gvs.gvz. Variable frequency speed regulating elevator).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
广日梯GVK.GVB.GVH.GVZ.变频调速电梯调试(GVK. Gvk.gvs.gvz. Variable frequency speed regulating elevator)

广日梯GVK.GVB.GVH.GVZ.变频调速电梯调试(GVK. Gvk.gvs.gvz. Variable frequency speed regulating elevator) GVK. Gvk.gvs.gvz. Variable frequency speed regulating elevator First, conduct on-site electrical circuit inspection. 1. Commissioning test run A car maintenance: Check whether the setting parameters of the complex frequency converter meet the requirements. In the car, the repair switch is put on the repair condition. Then, dont linger in the cage, while the upper computer room controls the screen. At this point, the PC input point X7, X10 will not be used for the test run. The internal instruction of the inside of the four sedan can be used for the short answer of the inside instruction of the high station of 11L14. The inside of the car is available in the lower end of the car. At this time, X7. X10 is not bright, and can be used for the test run. 1. The top of the car will be overhauled with 11L40 and 21L6 short [X11 bright] 2. The top of the car will be overhauled with 11L40 and 21L7 short. [X12]. 3. Maintenance of elevator status; When the 11L40 is slow or slow down, the elevator should be closed immediately. When the door is finished All shut down [Y3 quenched; GMJ downward. Y14 or Y15 ` Y12 ` Y0 light]. The lift immediately starts up or down. Its time to see if the elevator runs in the same direction as your instructions. If not, the set value of LF5 of inverter is changed. Until the elevator runs in the same direction as your instructions. At the same time, the direction of the frequency converter parameter LF88 and LF89 should be observed. If not, the set value of LF18 will be changed. Until the two directions are consistent. 4. The service should be opened immediately after the service stop. 5. Please note that due to the elevator first run, shaft is not clear, because the car collision on the shaft parts so ` downward trip dont control it too long. After the test and maintenance of the room is normal, the car can be operated on. C. crown operation; 1. Check whether

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档