- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建造师法规数字汇总(Builders code summary)
建造师法规数字汇总(Builders code summary)
3. The term of validity of the registered builder: 3 years
9. Supervisory and administrative organs: construction departments of the peoples governments at or above the county level
It is.
As a person with full capacity for civil conduct: under the age of 16, he is under the age of 18, with his own income as a major source of livelihood.
39. Term of protection of patent right: 20 years of invention; The other 10 years.
41. Duration of ordinary litigation: 2 years
The limitation of short term action (1 year) : the body is liable for damages (except product liability); Deferred or dishonored rent; Sale of substandard goods without qualification; The loss or damage of the storage property.
43. Limitation of special litigation: 4 years for foreign contract;
The limitation period for the carriage of goods by sea to the carrier shall be one year.
The longest period of protection: 20 years (objective counting time: the day of infringement).
Time of suspension: the last six months of the statute of limitations.
Reasons for suspension: force majeure or other obstacles (objective reasons).
When the lien is granted: the lien shall not be less than two months (except live and perishable movables)
The validity of the registration: without the consent of the holder of the right to register the property, the property right shall not be effected.
Notice registration failure: after the notice is registered, the creditors rights are eliminated or the date of the registration of the realty is not registered within three months.
2. Issuing departments for construction licenses: construction administrative departments at or above the county level
Department of issuance of safe production license: provincial construction administrative department (central enterprise shall be issued by the ministry of housing and construction)
(7) construction funds have been implemented; (the construction period is less than one year, and 50% of the contract price for the
您可能关注的文档
- 室内装修酒店五星标准(The five-star standard of interior decoration hotel).doc
- 室内装饰材料分类(Classification of interior decoration materials).doc
- 室内装饰材料用量计算方式和依据(Calculation method and basis for the use of interior decoration materials).doc
- 室内设计学用尺寸(Dimensions of interior design).doc
- 室内设计施工图制图规范(Design specifications for interior design).doc
- 室内设计的基本尺寸(The basic dimensions of interior design).doc
- 室内设计装饰材料核算知识汇总(Knowledge summary of interior design and decoration materials).doc
- 室内设计说明书范文(The interior design instruction manual).doc
- 室内设计风格与元素(Interior design styles and elements).doc
- 室内采暖管道安装工程技术交底_secret(Indoor heating piping installation engineering technology to the base).doc
- 开业策划(Business planning).doc
- 开发商承担房屋质量问题维修责任案(The developer is responsible for the maintenance of the quality of the house).doc
- 开发自动化测试脚本的技巧和心得(Develop skills and tips for automated test scripts).doc
- 开封到至张家界自驾游路书--自助游路线攻略(Kaifeng to zhangjiajie road book - self-help tour guide).doc
- 开封公交车线路(Open the bus line).doc
- 开车停车技巧及防范篇(附养眼美女)(Car parking skills and prevention (with eye candy)).doc
- 开车技巧(Driving skills).doc
- 异响原因(Sound reasons).doc
- 异响的行成原因及判断方法(The reason and judgment method of the abnormal line).doc
- 开心学堂答案(Happy school answers).doc
文档评论(0)